US20160292621A1 - Automatically identifying a project's staffing-availability risk - Google Patents
Automatically identifying a project's staffing-availability risk Download PDFInfo
- Publication number
- US20160292621A1 US20160292621A1 US14/672,352 US201514672352A US2016292621A1 US 20160292621 A1 US20160292621 A1 US 20160292621A1 US 201514672352 A US201514672352 A US 201514672352A US 2016292621 A1 US2016292621 A1 US 2016292621A1
- Authority
- US
- United States
- Prior art keywords
- staffing
- project
- proposed
- plan
- updated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000000034 method Methods 0.000 claims abstract description 48
- 230000004044 response Effects 0.000 claims abstract description 18
- 230000006870 function Effects 0.000 claims description 60
- 238000003860 storage Methods 0.000 claims description 49
- 238000004590 computer program Methods 0.000 claims description 23
- 238000007726 management method Methods 0.000 claims description 21
- 238000012913 prioritisation Methods 0.000 claims description 6
- 238000004458 analytical method Methods 0.000 description 14
- 238000010586 diagram Methods 0.000 description 10
- 238000012545 processing Methods 0.000 description 9
- 238000013500 data storage Methods 0.000 description 8
- 230000008569 process Effects 0.000 description 7
- 230000003287 optical effect Effects 0.000 description 5
- 230000005540 biological transmission Effects 0.000 description 4
- 230000003068 static effect Effects 0.000 description 4
- 238000003491 array Methods 0.000 description 3
- 238000009826 distribution Methods 0.000 description 3
- 238000004870 electrical engineering Methods 0.000 description 3
- 230000002452 interceptive effect Effects 0.000 description 3
- 238000012552 review Methods 0.000 description 3
- 238000007619 statistical method Methods 0.000 description 3
- 230000008901 benefit Effects 0.000 description 2
- 230000001419 dependent effect Effects 0.000 description 2
- 230000010354 integration Effects 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000005457 optimization Methods 0.000 description 2
- 230000001902 propagating effect Effects 0.000 description 2
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 description 1
- 241000282412 Homo Species 0.000 description 1
- 241000699670 Mus sp. Species 0.000 description 1
- 229910052802 copper Inorganic materials 0.000 description 1
- 239000010949 copper Substances 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 239000000835 fiber Substances 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 238000012804 iterative process Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000006855 networking Effects 0.000 description 1
- 238000013439 planning Methods 0.000 description 1
- 238000013468 resource allocation Methods 0.000 description 1
- 238000013349 risk mitigation Methods 0.000 description 1
- 239000004065 semiconductor Substances 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 238000012384 transportation and delivery Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
- G06Q10/063118—Staff planning in a project environment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0635—Risk analysis of enterprise or organisation activities
Definitions
- the present invention relates to optimizing allocation of resources related to staffing requirements.
- a project-staffing plan may require workers with certain combinations of skills to be available at specific times, but it is not always possible to satisfy all such requirements associated with a particular plan.
- there is more than one way to plan and implement a project there is no reliable, automated way to select an optimal project plan such that each required staffing resource has a sufficiently high probability of being available when required by the plan.
- a first embodiment of the present invention provides a computerized project-management system comprising a computer, a memory coupled to the computer, and a set of computer-readable hardware storage devices coupled to the computer, wherein the storage devices continually receive and store updated project-management information and further store program code configured to be run by the computer via the memory to implement a method for automatically identifying a proposed project's staffing-availability risk, the method comprising:
- the system receiving a proposed project-staffing plan, wherein the proposed plan identifies a set of staffing resources that will be required by the proposed project and a set of dates during which the resources of the set of staffing resources will be required;
- the computer in response to the system receiving the plan, retrieving from the storage devices updated staffing-supply data, comprised by the continually updated project information, wherein the updated supply data identifies an availability of each resource of the set of staffing resources during the dates specified by the proposed plan;
- the system in response to receiving the plan, further retrieving from the storage devices updated staffing-demand data, comprised by the continually updated project information, wherein the updated demand data identifies a set of competing demands for at least one resource of the set of staffing resources during the dates specified by the proposed plan, and wherein the set of competing demands comprises one or more staffing demands by one or more external projects that are distinct from the proposed project;
- the system adjusting the updated staffing-supply data and the updated staffing-demand data as a function of the continually updated project information
- the system revising the updated staffing-demand data as a function of a priority assigned to one or more of the external projects
- the system determining a likelihood that the set of staffing resources will be available to the proposed project on the dates identified by the proposed project plan, wherein the determining is performed as a function of the adjusting.
- a second embodiment of the present invention provides method for automatically identifying a proposed project's staffing-availability risk, the method comprising:
- a computerized project-management system receiving a proposed project-staffing plan, wherein the system comprises a computer and a set of computer-readable hardware storage devices that continually receive and store updated project-management information, and wherein the proposed plan identifies a set of staffing resources that will be required by the proposed project and a set of dates during which the resources of the set of staffing resources will be required;
- the computer in response to the system receiving the plan, retrieving from the storage devices updated staffing-supply data, comprised by the continually updated project information, wherein the updated supply data identifies an availability of each resource of the set of staffing resources during the dates specified by the proposed plan;
- the computer in response to receiving the plan, further retrieving from the storage devices updated staffing-demand data, comprised by the continually updated project information, wherein the updated demand data identifies a set of competing demands for at least one resource of the set of staffing resources during the dates specified by the proposed plan, and wherein the set of competing demands comprises one or more staffing demands by one or more external projects that are distinct from the proposed project;
- the system adjusting the updated staffing-supply data and the updated staffing-demand data as a function of the continually updated project information
- the system revising the updated staffing-demand data as a function of a priority assigned to one or more of the external projects
- the system determining a likelihood that the set of staffing resources will be available to the proposed project on the dates identified by the proposed project plan, wherein the determining is performed as a function of the adjusting
- a third embodiment of the present invention provides a computer program product, comprising a computer-readable hardware storage device having a computer-readable program code stored therein, the program code configured to be executed by a computerized project-management system comprising a computer, a memory coupled to the computer, and a set of computer-readable hardware storage devices coupled to the computer, wherein the storage devices continually receive and store updated project-management information and further store program code configured to be run by the computer via the memory to implement a method for automatically identifying a proposed project's staffing-availability risk, the method comprising:
- the system receiving a proposed project-staffing plan, wherein the proposed plan identifies a set of staffing resources that will be required by the proposed project and a set of dates during which the resources of the set of staffing resources will be required;
- the computer in response to the system receiving the plan, retrieving from the storage devices updated staffing-supply data, comprised by the continually updated project information, wherein the updated supply data identifies an availability of each resource of the set of staffing resources during the dates specified by the proposed plan;
- the system in response to receiving the plan, further retrieving from the storage devices updated staffing-demand data, comprised by the continually updated project information, wherein the updated demand data identifies a set of competing demands for at least one resource of the set of staffing resources during the dates specified by the proposed plan, and wherein the set of competing demands comprises one or more staffing demands by one or more external projects that are distinct from the proposed project;
- the system adjusting the updated staffing-supply data and the updated staffing-demand data as a function of the continually updated project information
- the system revising the updated staffing-demand data as a function of a priority assigned to one or more of the external projects
- the system determining a likelihood that the set of staffing resources will be available to the proposed project on the dates identified by the proposed project plan, wherein the determining is performed as a function of the adjusting.
- FIG. 1 shows a structure of a computer system and computer program code that may be used to implement a method for automatically identifying a project's staffing-availability risk in accordance with embodiments of the present invention.
- FIG. 2 is a flow chart that shows steps of an embodiment of the present invention that automatically identify a project's staffing availability risk.
- Embodiments of the present invention comprise methods and systems that identify a risk that project-staffing plan will not be able to acquire the staffing resources it needs at the times that it needs them.
- This procedure may incorporate a computerized project-management system that may aggregate and analyze a large number of current and historical business, financial, personnel, or project-management records. These records may be located at different physical locations, stored on different platforms, and updated by a large variety of users according to different schedules.
- This system may identify subtle patterns in this aggregated data from which it infers trends or interactions among records that have affected success rates of previous project plans or that may affect a likelihood of success of a current project-staffing plan.
- the computerized project-management system may then use these inferences to dynamically adjust or weight the project plan's requirements for staffing resources and the expected availabilities of those required resources.
- Embodiments of the present invention may automatically aggregate these records from electronic sources through computer networks in order to ensure that the aggregated data is current enough to provide an accurate result.
- Some embodiments provide an iterative or “what-if scenario” function that lets users vary parameters of the project-staffing plan in order to determine whether those variations affect a likelihood that the staffing plan is feasible and satisfies other business requirements.
- the computerized system automatically updates the aggregated data during each what-if iteration in order to ensure that the what-if analysis is accurate.
- the system allows a user to choose whether each what-if analysis uses the most current data or whether each what-if scenario is performed with a same set of aggregated data, in order to perform direct comparisons among scenarios.
- a computerized project-management system in response to receiving a proposed project-staffing plan, returns a “risk score” that characterizes a likelihood that staffing resources required by the plan will not be available when needed.
- the system performs this task by performing novel resource-availability and project-requirements analyses, and then determining how likely it is that the supply of staffing resources will fail to meet project demands.
- the system then adjusts these figures as a function of inferred business rules, patterns, and trends. This information is then used to develop probabilistic profiles to characterize each variation of a candidate project-staffing plan by a risk score that allows a project manager or team leader to select a plan that best satisfies financial, scheduling, and business requirements and offers a greatest probability of being able to timely satisfy its staffing needs.
- some embodiments provide further benefits by offering an iterative, and real-time, interactive, or batch, operating mode that allows a project leader to run successive “what-if” analyses.
- Such embodiments may, when identifying a risk score associated with a proposed staffing plan, allow a user to vary one or more characteristics of the proposed plan to determine whether an acceptable modification may significantly reduce the project's staffing risk. A user may perform this function repeatedly until the system identifies a plan that presents an acceptable level of risk without compromising other business requirements, such as delivery times, labor costs, or quality of deliverables.
- the present invention may be used, not only to identify staffing-availability risks, but to help project managers mitigate such risks within extrinsic project or business constraints, and based on current information aggregated from multiple sources. Some embodiments may further support such risk-mitigation by describing staffing risks in greater detail. An embodiment might, for example, enumerate precise labor or non-labor costs associated with each project task, identify a critical path that may have resulted from conflicting or too-tightly scheduled staffing projections, or detect and report indirect costs associated with particular staffing requirements.
- Some embodiments may thus provide an automated optimization tool that allows a user to identify a project-staffing plan that is most likely to be able to satisfy its staffing requirements while satisfying other constraints inferred from archived or current project or business data, or that are manually specified or revised by a user.
- An embodiment may apply similar optimization techniques in other ways.
- An embodiment might, for example, be used to identify a likelihood that a project or task is able to access materials, outside services, capital, or other project resources in timely accordance with requirements of a project's resource-management or other type of plan.
- FIG. 1 shows a structure of a computer system and computer program code that may be used to implement a method for automatically identifying a project's staffing-availability risk in accordance with embodiments of the present invention.
- FIG. 1 refers to objects 101 - 117 .
- aspects of the present invention may take the form of an entirely hardware embodiment, an entirely software embodiment (including firmware, resident software, microcode, etc.) or an embodiment combining software and hardware aspects that may all generally be referred to herein as a “circuit,” “module,” or “system.”
- the present invention may be a system, a method, and/or a computer program product.
- the computer program product may include a computer readable storage medium (or media) having computer readable program instructions thereon for causing a processor to carry out aspects of the present invention.
- the computer readable storage medium can be a tangible device that can retain and store instructions for use by an instruction execution device.
- the computer readable storage medium may be, for example, but is not limited to, an electronic storage device, a magnetic storage device, an optical storage device, an electromagnetic storage device, a semiconductor storage device, or any suitable combination of the foregoing.
- a non-exhaustive list of more specific examples of the computer readable storage medium includes the following: a portable computer diskette, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or Flash memory), a static random access memory (SRAM), a portable compact disc read-only memory (CD-ROM), a digital versatile disk (DVD), a memory stick, a floppy disk, a mechanically encoded device such as punch-cards or raised structures in a groove having instructions recorded thereon, and any suitable combination of the foregoing.
- RAM random access memory
- ROM read-only memory
- EPROM or Flash memory erasable programmable read-only memory
- SRAM static random access memory
- CD-ROM compact disc read-only memory
- DVD digital versatile disk
- memory stick a floppy disk
- a mechanically encoded device such as punch-cards or raised structures in a groove having instructions recorded thereon
- a computer readable storage medium is not to be construed as being transitory signals per se, such as radio waves or other freely propagating electromagnetic waves, electromagnetic waves propagating through a waveguide or other transmission media (e.g., light pulses passing through a fiber-optic cable), or electrical signals transmitted through a wire.
- Computer readable program instructions described herein can be downloaded to respective computing/processing devices from a computer readable storage medium or to an external computer or external storage device via a network, for example, the Internet, a local area network, a wide area network and/or a wireless network.
- the network may comprise copper transmission cables, optical transmission fibers, wireless transmission, routers, firewalls, switches, gateway computers and/or edge servers.
- a network adapter card or network interface in each computing/processing device receives computer readable program instructions from the network and forwards the computer readable program instructions for storage in a computer readable storage medium within the respective computing/processing device.
- Computer readable program instructions for carrying out operations of the present invention may be assembler instructions, instruction-set-architecture (ISA) instructions, machine instructions, machine dependent instructions, microcode, firmware instructions, state-setting data, or either source code or object code written in any combination of one or more programming languages, including an object oriented programming language such as Smalltalk, C++ or the like, and conventional procedural programming languages, such as the “C” programming language or similar programming languages.
- the computer readable program instructions may execute entirely on the user's computer, partly on the user's computer, as a stand-alone software package, partly on the user's computer and partly on a remote computer or entirely on the remote computer or server.
- the remote computer may be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or the connection may be made to an external computer (for example, through the Internet using an Internet Service Provider).
- electronic circuitry including, for example, programmable logic circuitry, field-programmable gate arrays (FPGA), or programmable logic arrays (PLA) may execute the computer readable program instructions by utilizing state information of the computer readable program instructions to personalize the electronic circuitry, in order to perform aspects of the present invention.
- These computer readable program instructions may be provided to a processor of a general purpose computer, special purpose computer, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, create means for implementing the functions/acts specified in the flowchart and/or block diagram block or blocks.
- These computer readable program instructions may also be stored in a computer readable storage medium that can direct a computer, a programmable data processing apparatus, and/or other devices to function in a particular manner, such that the computer readable storage medium having instructions stored therein comprises an article of manufacture including instructions which implement aspects of the function/act specified in the flowchart and/or block diagram block or blocks.
- the computer readable program instructions may also be loaded onto a computer, other programmable data processing apparatus, or other device to cause a series of operational steps to be performed on the computer, other programmable apparatus or other device to produce a computer implemented process, such that the instructions which execute on the computer, other programmable apparatus, or other device implement the functions/acts specified in the flowchart and/or block diagram block or blocks.
- each block in the flowchart or block diagrams may represent a module, segment, or portion of instructions, which comprises one or more executable instructions for implementing the specified logical function(s).
- the functions noted in the block may occur out of the order noted in the figures.
- two blocks shown in succession may, in fact, be executed substantially concurrently, or the blocks may sometimes be executed in the reverse order, depending upon the functionality involved.
- computer system 101 comprises a processor 103 coupled through one or more I/O Interfaces 109 to one or more hardware data storage devices 111 and one or more I/O devices 113 and 115 .
- Hardware data storage devices 111 and 117 may include, but are not limited to, magnetic tape drives, fixed or removable hard disks, optical discs, storage-equipped mobile devices, and solid-state random-access or read-only storage devices.
- I/O devices may comprise, but are not limited to: input devices 113 , such as keyboards, scanners, handheld telecommunications devices, touch-sensitive displays, tablets, biometric readers, joysticks, trackballs, or computer mice; and output devices 115 , which may comprise, but are not limited to printers, plotters, tablets, mobile telephones, displays, or sound-producing devices.
- Data storage devices 111 and 117 , input devices 113 , and output devices 115 may be located either locally or at remote sites from which they are connected to I/O Interface 109 through a network interface.
- Storage devices 117 may comprise any combination of local and remote nontransitory, virtual or real, storage media that may be distributed among multiple geographical locations, implemented on different platforms, or store data in different formats.
- This stored data may comprise any sort of current or historical records that a business deems relevant to project-staffing requirements. As will be discussed in FIG. 2 , these records may, for example, identify accuracy of past predictions of resource supply or demand, staff attrition rate, start-date slippage, or other implementation-dependent data that may be a function of business, technical, or financial constraints.
- these devices 117 may include, but are not limited to, virtual or real computing or storage systems that store databases and logs at multiple locations across an enterprise network or cloud-computing platform.
- Processor 103 may also be connected to one or more memory devices 105 , which may include, but are not limited to, Dynamic RAM (DRAM), Static RAM (SRAM), Programmable Read-Only Memory (PROM), Field-Programmable Gate Arrays (FPGA), Secure Digital memory cards, SIM cards, or other types of memory devices.
- DRAM Dynamic RAM
- SRAM Static RAM
- PROM Programmable Read-Only Memory
- FPGA Field-Programmable Gate Arrays
- SIM cards SIM cards, or other types of memory devices.
- At least one memory device 105 contains stored computer program code 107 , which is a computer program that comprises computer-executable instructions.
- the stored computer program code includes a program that implements a method for automatically identifying a project's staffing-availability risk in accordance with embodiments of the present invention, and may implement other embodiments described in this specification, including the methods illustrated in FIGS. 1-2 .
- the data storage devices 111 may store the computer program code 107 .
- Computer program code 107 stored in the storage devices 111 is configured to be executed by processor 103 via the memory devices 105 .
- Processor 103 executes the stored computer program code 107 .
- stored computer program code 107 may be stored on a static, nonremovable, read-only storage medium such as a Read-Only Memory (ROM) device 105 , or may be accessed by processor 103 directly from such a static, nonremovable, read-only medium 105 .
- stored computer program code 107 may be stored as computer-readable firmware 105 , or may be accessed by processor 103 directly from such firmware 105 , rather than from a more dynamic or removable hardware data-storage device 111 , such as a hard drive or optical disc.
- the present invention discloses a process for supporting computer infrastructure, integrating, hosting, maintaining, and deploying computer-readable code into the computer system 101 , wherein the code in combination with the computer system 101 is capable of performing a method for automatically identifying a project's staffing-availability risk.
- any of the components of the present invention could be created, integrated, hosted, maintained, deployed, managed, serviced, supported, etc. by a service provider who offers to facilitate a method for automatically identifying a project's staffing-availability risk.
- the present invention discloses a process for deploying or integrating computing infrastructure, comprising integrating computer-readable code into the computer system 101 , wherein the code in combination with the computer system 101 is capable of performing a method for automatically identifying a project's staffing-availability risk.
- One or more data storage units 111 may be used as a computer-readable hardware storage device having a computer-readable program embodied therein and/or having other data stored therein, wherein the computer-readable program comprises stored computer program code 107 .
- a computer program product (or, alternatively, an article of manufacture) of computer system 101 may comprise the computer-readable hardware storage device.
- program code 107 for automatically identifying a project's staffing-availability risk may be deployed by manually loading the program code 107 directly into client, server, and proxy computers (not shown) by loading the program code 107 into a computer-readable storage medium (e.g., computer data storage device 111 ), program code 107 may also be automatically or semi-automatically deployed into computer system 101 by sending program code 107 to a central server (e.g., computer system 101 ) or to a group of central servers. Program code 107 may then be downloaded into client computers (not shown) that will execute program code 107 .
- a central server e.g., computer system 101
- Program code 107 may then be downloaded into client computers (not shown) that will execute program code 107 .
- program code 107 may be sent directly to the client computer via e-mail.
- Program code 107 may then either be detached to a directory on the client computer or loaded into a directory on the client computer by an e-mail option that selects a program that detaches program code 107 into the directory.
- Another alternative is to send program code 107 directly to a directory on the client computer hard drive. If proxy servers are configured, the process selects the proxy server code, determines on which computers to place the proxy servers' code, transmits the proxy server code, and then installs the proxy server code on the proxy computer. Program code 107 is then transmitted to the proxy server and stored on the proxy server.
- program code 107 for automatically identifying a project's staffing-availability risk is integrated into a client, server and network environment by providing for program code 107 to coexist with software applications (not shown), operating systems (not shown) and network operating systems software (not shown) and then installing program code 107 on the clients and servers in the environment where program code 107 will function.
- the first step of the aforementioned integration of code included in program code 107 is to identify any software on the clients and servers, including the network operating system (not shown), where program code 107 will be deployed that are required by program code 107 or that work in conjunction with program code 107 .
- This identified software includes the network operating system, where the network operating system comprises software that enhances a basic operating system by adding networking features.
- the software applications and version numbers are identified and compared to a list of software applications and correct version numbers that have been tested to work with program code 107 . A software application that is missing or that does not match a correct version number is upgraded to the correct version.
- a program instruction that passes parameters from program code 107 to a software application is checked to ensure that the instruction's parameter list matches a parameter list required by the program code 107 .
- a parameter passed by the software application to program code 107 is checked to ensure that the parameter matches a parameter required by program code 107 .
- the client and server operating systems including the network operating systems, are identified and compared to a list of operating systems, version numbers, and network software programs that have been tested to work with program code 107 .
- An operating system, version number, or network software program that does not match an entry of the list of tested operating systems and version numbers is upgraded to the listed level on the client computers and upgraded to the listed level on the server computers.
- program code 107 After ensuring that the software, where program code 107 is to be deployed, is at a correct version level that has been tested to work with program code 107 , the integration is completed by installing program code 107 on the clients and servers.
- Embodiments of the present invention may be implemented as a method performed by a processor of a computer system, as a computer program product, as a computer system, or as a processor-performed process or service for supporting computer infrastructure.
- FIG. 2 is a flow chart that shows steps of an embodiment of the present invention that automatically identify a project's staffing availability risk.
- FIG. 2 shows steps 200 - 280 .
- a component of a computerized project-management system receives a proposed project-staffing plan.
- This plan will include descriptions of staffing-resource requirements that may each specify:
- This proposed plan may identify a large number of required resources and may further identify prospective sources for some or all of the required resources.
- a proposed plan may require sixty computer programmers organized into four groups, each of which is associated with a different type of software, and each of which is only available from one particular Engineering Department.
- the system responds to receiving the proposed plan by requesting and receiving resource-supply data.
- This data may be gathered from any number of sources and may be structured or organized in a variety of compatible or incompatible formats.
- the system in this step may request personnel-scheduling records from twelve sites at which the four Engineering Departments maintain staff.
- the requested information may reside in numerous databases and logs stored on a variety of platforms, such as Windows Server-based database servers, Linux database servers, a distributed human-resource system running under a virtual operating system, and a set of flat-files contained in a transaction-processing system's archived transaction log.
- this retrieved data will identify availability of the requested staffing resources at the times they will be needed by the proposed project plan.
- the system further responds to receiving the proposed plan by requesting and receiving resource-demand data.
- this demand data may be gathered from any number of sources and may be structured or organized in a variety of compatible or incompatible formats.
- the requested resource-demand information may reside in numerous databases and logs stored on a variety of platforms, such as Windows Server-based database servers, Linux database servers, a distributed human-resource system running under a virtual operating system, and a set of flat-files contained in a transaction-processing system's archived transaction log. This demand information will be described in greater detail below.
- a more simple project-planning procedure might at this point attempt to merely match supply and demand figures in order to determine which staffing requirements can be satisfied. If, for example, received records unequivocally state that only three mechanical engineers will be available during March, 2016 in order to satisfy the proposed project plan's requirement for six mechanical engineers, then this simpler procedure would merely identify that the requirement cannot be satisfied. Such a procedure could provide little or no guidance to a project manager seeking to determine whether varying a parameter of the project plan would increase a likelihood that sufficient engineering resources would be available when needed.
- Steps 230 - 270 of the present invention perform a more sophisticated set of adjustments that may more accurately determine likely real-world project requirements and resource availabilities. As described below, these adjustments are performed in response to receiving the most current resource-availability and demand figures in the most recent iteration of steps 210 and 220 , and may involve sequences of statistical operations based on information and trends culled from the received availability and demand figures. These operations allow the system to report nuanced likelihoods that the proposed project plan, or some components of the plan, will be able to secure required staffing resources in a timely manner.
- step 230 the system begins analyzing and applying results of the analysis to the proposed project plan.
- the system determines whether to adjust the project's proposed start date. In some embodiments, this adjustment may ripple to other dates associated with the project, such as a start date of a particular project task, or a structure of a critical path that is defined as a function of a date associated with one or more tasks on the critical path.
- the computerized system may adjust the proposed project start date by performing a statistical or other analysis upon data that compares planned and actual start dates of previous projects.
- This analysis may be a further function of other parameters, such as a location, time, or business function associated with a project.
- the system in step 230 may analyze past-project data received in step 220 to determine that similar engineering projects started over the last two years at the same (or a similar) site actually started on average two weeks later than the projects scheduled start date. The system might then adjust the project start date, or the start dates of all or some of the tasks comprised by the project, by two weeks.
- the system in this step may adjust start dates of only those tasks that require electrical engineering skills, or dates of those tasks that depend upon tasks that require electrical engineering skills.
- one or more start dates may be adjusted as a function of data received in steps 210 or 220 .
- the system may determine start date adjustments through statistical methods known to those skilled in the art.
- Sites may, for example, be assigned weightings that indicate a degree of similarity to the proposed project's site and amounts of start delay at these sites may be modified by these weightings.
- the system may assign weightings to start-date adjustments of past projects as a function of how similar those projects were to the proposed project, or may organize past start-date adjustments into a statistical distribution (such as a Poisson distribution), using the mean or standard deviation of that distribution to determine a most likely start-date adjustment for the proposed project.
- a statistical distribution such as a Poisson distribution
- step 230 the system will have adjusted the start date of the project, and may have further adjusted dates associated with one or more tasks of the project, and these adjustments will have been performed automatically as a function of components of data received in steps 210 and 220 .
- a project's win odds identifies a likelihood that the project's expected staffing requirements will actually materialize. This may be a function of the project's likelihood to be approved by management, of the likelihood that a client may sign a contract necessary to initiate the project, or that the project will actually require the resources identified in the proposed project plan. In one example, if a client has already signed a contract authorizing the commencement of a project, then that project may be assigned win odds of 100%. If, on the other hand, an unsigned projected is awaiting a commitment from a client that has historically accepted only 10% of proposed projects, that project might be assigned significantly lower win odds.
- a project's win odds may have been manually entered or otherwise identified by a sales-team member, a manager, a customer representative, or other worker.
- the project's win odds may be determined by more complex, business-specific or implementation-specific, functions of parameters that may include: the location or country of origin of the project site or of a client, a project history of a particular client, or of extrinsic financial, business, or market conditions. These functions may be defined by methods known to those skilled in the art, or known to those with expert knowledge of the project's goals or of related business priorities.
- step 240 if an external “unsigned” project (one that has been offered to a client that has not yet signed a project contract) is deemed in step 240 to have 70% win odds then that project's requirement for ten analysts in May, 2015 might be adjusted to require only seven analysts. Such an adjustment would correspondingly increase an availability of analysts during that month. So, if the proposed project plan identifies a requirement for four of eleven analysts during May, 2015, lowering the unsigned project's requirement from ten analysts to seven analysts would increase a likelihood that the proposed project plan would be able to secure the four analysts it needs during that May.
- the system computes win odds for some or all projects and resource demands that may compete for resources identified by the proposed project plan. At the conclusion of step 240 , the system will thus have adjusted the projected demand for staffing resources that may reduce the amount of resources available to the proposed project.
- step 250 the system reviews historical attrition records received in step 210 or 220 . These records identify patterns of staff attrition that may be used to project ways in which future attrition may affect the supply of staffing resources. This review may consider only attrition records that span a particular period of time, such as the most recent 24 months, or that refer to only particular sites, countries, types of skill, or job functions.
- the received data may indicate that one class of machine operators working in the United Kingdom has experienced, on average, 5% attrition during the month of December during the past three years. If the proposed project-staffing plan requires this class of workers during a future December (after any date adjustments in step 230 ), then the system will reduce the expected number of available machinists by 5% when determining in step 280 a likelihood that the project's December staffing requirements can be met.
- step 260 the system performs another adjustment to the resource-supply information received in steep 210 by considering “roll-off accuracies” of required staffing resource.
- a resource's roll-off accuracy identifies an accuracy of a projection of a worker's availability start date if that availability commences when the worker completes another project.
- the system in this step, may perform a statistical analysis of past project-completion dates of workers who are similar to the NC operator. If, for example, workers with the same job skill, working at the same location, have historically completed projects on average one week late, then the system in this step may adjust the NC operator's availability to begin on February 26, rather than February 19. In other cases, additional weightings or other statistical factors may result in an adjustment other than one week, but which is nonetheless a function of the historical roll-off accuracy statistics extracted from the data received in step 210 .
- some embodiments perform this analysis on a class of workers and apply the results to a required individual
- other embodiments may analyze an individual's historic performance patterns, or may apply the results of a roll-off accuracy analysis to an entire class of workers.
- the system identifies and implements business rules to prioritize or adjust staffing-resource demands inferred from the information received in step 220 .
- This prioritization allows resources to be allocated to competing tasks or projects such that the most important or the most likely requirements are met first.
- Other business rules may place further constraints upon an embodiment of the present invention.
- One such rule might, for example, limit staffing analyses to a specific period, such as forty weeks or eighteen months from the current day. Such a limitation would prevent the system from considering staffing requirements that are expected to materialize too far in the future to be reliably analyzed.
- Prioritization business rules may, for example, be used to divide projects or project tasks into categories that are each associated with a resource-allocation priority. When competing for a particular resource, that resource would be more likely awarded to a project or task that has a higher priority.
- projects and tasks may be divided into “signed” and “unsigned” categories, as a function of whether a client has signed a contract required to initiate the project or task.
- a signed project or task would always have a higher priority than an unsigned project or task.
- an unsigned project or task associated with higher win odds may be assigned a higher priority than one that is associated with lower win odds.
- Other prioritization schemes may be added to this step, as desired by a project manager or system designer.
- step 280 the system performs a probability feasibility analysis that determines a likelihood that the proposed project-staffing plan will be able to successfully access the staffing resources it needs at the required times.
- This likelihood may be expressed as a single number (a “risk score”) or as a set or table of numbers. In some embodiments, some or all tasks may each be assigned a specific risk score.
- This probability analysis is performed via straightforward operational functions that compare the plan's staffing demands to projected resource availability, where both the demand and availability figures have been adjusted in steps 220 - 270 .
- the risk score may be a unitless number, or may be expressed as a percent probability, or in any other format that clearly represents relative likelihoods of project success.
- the system may then allow a user to modify one or more characteristics of the proposed project-staffing plan and resubmit it to the system.
- the method of steps 200 - 280 would then repeat.
- the system might, in this iteration, reuse the data received in the previous iteration steps 210 and 220 , or might reuse the adjusted data identified in steps 230 - 270 .
- the system would, in this iteration, request and receive updated versions of the data in steps 210 and 220 , and then repeat the analysis and adjustments of steps 230 - 270 on the updated received data.
- the system will allow a user to repeatedly vary one or more parameters of its proposed staffing plan, with the method of steps 200 - 280 repeating once for each variation.
- a user may interactively test “what-if” scenarios in order to identify a staffing plan that has an acceptable likelihood of success or that satisfies other business, financial, or technical constraints.
- a user may use a computerized project-management system based on an embodiment of the present invention to optimize a project-staffing plan such that the optimized plan is characterized by one or more sufficiently low risk scores representing a sufficiently high likelihood that staffing resources required by the plan will be available at times identified by the plan as being associated with each required resource; and may be further characterized as satisfying other user, business, or project constraints, such as being completed by a deadline date or falling within desired budget constraints.
- one or more of the other constraints may be manually revised by a user in an iterative or interactive process, as described above.
- the system may perform this iterative process interactively, in real time or near real-time, regardless of whether the system requests and receives updated data during each repetition of steps 210 and 220 .
- this interactive or iterative ‘what-if scenario” process may identify to a user that it is not possible, or highly unlikely, that any plan can be characterized by both a low risk score (or acceptable likelihood that required staffing resources will be timely available) and by an acceptable likelihood that the plan will satisfy the other constraints.
- the present invention provides a technical advantage by reporting this conclusion to a user with greater nuance, precision, and accuracy, based on the most current information, automatically culled, aggregated, formatted, organized, and mined from possibly heterogeneous, distributed sources, than would be possible through conventional means.
- FIG. 2 identifies one particular sequence of steps
- embodiments of the present invention may perform steps 210 - 270 in an other rational order.
- Steps 230 - 260 may be performed in different order in one embodiment, or steps 240 - 260 may be performed in a reverse order in another embodiment.
- one or more of the adjustments of steps 220 - 270 may be omitted and, in other embodiments, such omissions may be selected at run time, as a function of a detection that a requested subset of the data received in steps 210 and 220 was omitted or contained too few sample points to assure statistically meaningful results.
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- Operations Research (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Marketing (AREA)
- Educational Administration (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
A method and associated systems for automatically identifying a risk that a staffing resource identified by a proposed project-staffing plan will be unavailable. A computerized project-management tool, in response to receiving a proposed project plan, requests, receives, and aggregates information about other past, present, and expected projects and about expected supplies of, and competing demands for, staffing resources required by the proposed plan. The tool infers patterns, business rules, and trends from the received information, with which it adjusts the proposed project's planned start date, expected availabilities of required staffing resources, and expected competition for staffing resources. The tool then determines a likelihood that a sufficient supply of each of the plan's required staffing resources, as adjusted, will be available at the required times, as adjusted. If the risk is too high, the user may fine-tune the proposed plan by repeating the preceding steps with varying project parameters.
Description
- The present invention relates to optimizing allocation of resources related to staffing requirements.
- A project-staffing plan may require workers with certain combinations of skills to be available at specific times, but it is not always possible to satisfy all such requirements associated with a particular plan. When there is more than one way to plan and implement a project, there is no reliable, automated way to select an optimal project plan such that each required staffing resource has a sufficiently high probability of being available when required by the plan.
- A first embodiment of the present invention provides a computerized project-management system comprising a computer, a memory coupled to the computer, and a set of computer-readable hardware storage devices coupled to the computer, wherein the storage devices continually receive and store updated project-management information and further store program code configured to be run by the computer via the memory to implement a method for automatically identifying a proposed project's staffing-availability risk, the method comprising:
- the system receiving a proposed project-staffing plan, wherein the proposed plan identifies a set of staffing resources that will be required by the proposed project and a set of dates during which the resources of the set of staffing resources will be required;
- the computer, in response to the system receiving the plan, retrieving from the storage devices updated staffing-supply data, comprised by the continually updated project information, wherein the updated supply data identifies an availability of each resource of the set of staffing resources during the dates specified by the proposed plan;
- the system, in response to receiving the plan, further retrieving from the storage devices updated staffing-demand data, comprised by the continually updated project information, wherein the updated demand data identifies a set of competing demands for at least one resource of the set of staffing resources during the dates specified by the proposed plan, and wherein the set of competing demands comprises one or more staffing demands by one or more external projects that are distinct from the proposed project;
- the system adjusting the updated staffing-supply data and the updated staffing-demand data as a function of the continually updated project information;
- the system revising the updated staffing-demand data as a function of a priority assigned to one or more of the external projects;
- the system determining a likelihood that the set of staffing resources will be available to the proposed project on the dates identified by the proposed project plan, wherein the determining is performed as a function of the adjusting.
- A second embodiment of the present invention provides method for automatically identifying a proposed project's staffing-availability risk, the method comprising:
- a computerized project-management system receiving a proposed project-staffing plan, wherein the system comprises a computer and a set of computer-readable hardware storage devices that continually receive and store updated project-management information, and wherein the proposed plan identifies a set of staffing resources that will be required by the proposed project and a set of dates during which the resources of the set of staffing resources will be required;
- the computer, in response to the system receiving the plan, retrieving from the storage devices updated staffing-supply data, comprised by the continually updated project information, wherein the updated supply data identifies an availability of each resource of the set of staffing resources during the dates specified by the proposed plan;
- the computer, in response to receiving the plan, further retrieving from the storage devices updated staffing-demand data, comprised by the continually updated project information, wherein the updated demand data identifies a set of competing demands for at least one resource of the set of staffing resources during the dates specified by the proposed plan, and wherein the set of competing demands comprises one or more staffing demands by one or more external projects that are distinct from the proposed project;
- the system adjusting the updated staffing-supply data and the updated staffing-demand data as a function of the continually updated project information;
- the system revising the updated staffing-demand data as a function of a priority assigned to one or more of the external projects;
- the system determining a likelihood that the set of staffing resources will be available to the proposed project on the dates identified by the proposed project plan, wherein the determining is performed as a function of the adjusting
- A third embodiment of the present invention provides a computer program product, comprising a computer-readable hardware storage device having a computer-readable program code stored therein, the program code configured to be executed by a computerized project-management system comprising a computer, a memory coupled to the computer, and a set of computer-readable hardware storage devices coupled to the computer, wherein the storage devices continually receive and store updated project-management information and further store program code configured to be run by the computer via the memory to implement a method for automatically identifying a proposed project's staffing-availability risk, the method comprising:
- the system receiving a proposed project-staffing plan, wherein the proposed plan identifies a set of staffing resources that will be required by the proposed project and a set of dates during which the resources of the set of staffing resources will be required;
- the computer, in response to the system receiving the plan, retrieving from the storage devices updated staffing-supply data, comprised by the continually updated project information, wherein the updated supply data identifies an availability of each resource of the set of staffing resources during the dates specified by the proposed plan;
- the system, in response to receiving the plan, further retrieving from the storage devices updated staffing-demand data, comprised by the continually updated project information, wherein the updated demand data identifies a set of competing demands for at least one resource of the set of staffing resources during the dates specified by the proposed plan, and wherein the set of competing demands comprises one or more staffing demands by one or more external projects that are distinct from the proposed project;
- the system adjusting the updated staffing-supply data and the updated staffing-demand data as a function of the continually updated project information;
- the system revising the updated staffing-demand data as a function of a priority assigned to one or more of the external projects;
- the system determining a likelihood that the set of staffing resources will be available to the proposed project on the dates identified by the proposed project plan, wherein the determining is performed as a function of the adjusting.
-
FIG. 1 shows a structure of a computer system and computer program code that may be used to implement a method for automatically identifying a project's staffing-availability risk in accordance with embodiments of the present invention. -
FIG. 2 is a flow chart that shows steps of an embodiment of the present invention that automatically identify a project's staffing availability risk. - Embodiments of the present invention comprise methods and systems that identify a risk that project-staffing plan will not be able to acquire the staffing resources it needs at the times that it needs them.
- This procedure may incorporate a computerized project-management system that may aggregate and analyze a large number of current and historical business, financial, personnel, or project-management records. These records may be located at different physical locations, stored on different platforms, and updated by a large variety of users according to different schedules.
- This system may identify subtle patterns in this aggregated data from which it infers trends or interactions among records that have affected success rates of previous project plans or that may affect a likelihood of success of a current project-staffing plan. The computerized project-management system may then use these inferences to dynamically adjust or weight the project plan's requirements for staffing resources and the expected availabilities of those required resources.
- Embodiments of the present invention may automatically aggregate these records from electronic sources through computer networks in order to ensure that the aggregated data is current enough to provide an accurate result. Some embodiments provide an iterative or “what-if scenario” function that lets users vary parameters of the project-staffing plan in order to determine whether those variations affect a likelihood that the staffing plan is feasible and satisfies other business requirements.
- In certain of these embodiments, the computerized system automatically updates the aggregated data during each what-if iteration in order to ensure that the what-if analysis is accurate. In other embodiments, the system allows a user to choose whether each what-if analysis uses the most current data or whether each what-if scenario is performed with a same set of aggregated data, in order to perform direct comparisons among scenarios.
- These methods and systems could not be performed without a computerized project-management system and represent more than a mere application of a business method to a generic computer system. It would be impossible for a human to analyze and detect subtle patterns in the enormous amount of motley data often relevant to a large project. It would also be impossible for a human to perform this method at a speed required for this invention to work. By the time a human, or team of humans, could aggregate, review, and analyze such data, portions of that data could have become obsolete. And there is no possible way that such an analysis could be performed with real-time (or near real-time) performance necessary to enable a user to perform successive what-if scenarios in order to interactively and iteratively fine-tune an acceptable staffing plan.
- This document thus describes embodiments of this invention in which a computerized project-management system, in response to receiving a proposed project-staffing plan, returns a “risk score” that characterizes a likelihood that staffing resources required by the plan will not be available when needed. The system performs this task by performing novel resource-availability and project-requirements analyses, and then determining how likely it is that the supply of staffing resources will fail to meet project demands.
- In particular, after extracting these supply and demand figures from records of past projects and projections of future staffing availability, the system then adjusts these figures as a function of inferred business rules, patterns, and trends. This information is then used to develop probabilistic profiles to characterize each variation of a candidate project-staffing plan by a risk score that allows a project manager or team leader to select a plan that best satisfies financial, scheduling, and business requirements and offers a greatest probability of being able to timely satisfy its staffing needs.
- As described above, some embodiments provide further benefits by offering an iterative, and real-time, interactive, or batch, operating mode that allows a project leader to run successive “what-if” analyses. Such embodiments may, when identifying a risk score associated with a proposed staffing plan, allow a user to vary one or more characteristics of the proposed plan to determine whether an acceptable modification may significantly reduce the project's staffing risk. A user may perform this function repeatedly until the system identifies a plan that presents an acceptable level of risk without compromising other business requirements, such as delivery times, labor costs, or quality of deliverables.
- In this way, the present invention may be used, not only to identify staffing-availability risks, but to help project managers mitigate such risks within extrinsic project or business constraints, and based on current information aggregated from multiple sources. Some embodiments may further support such risk-mitigation by describing staffing risks in greater detail. An embodiment might, for example, enumerate precise labor or non-labor costs associated with each project task, identify a critical path that may have resulted from conflicting or too-tightly scheduled staffing projections, or detect and report indirect costs associated with particular staffing requirements.
- Some embodiments may thus provide an automated optimization tool that allows a user to identify a project-staffing plan that is most likely to be able to satisfy its staffing requirements while satisfying other constraints inferred from archived or current project or business data, or that are manually specified or revised by a user.
- Other embodiments may apply similar optimization techniques in other ways. An embodiment might, for example, be used to identify a likelihood that a project or task is able to access materials, outside services, capital, or other project resources in timely accordance with requirements of a project's resource-management or other type of plan.
-
FIG. 1 shows a structure of a computer system and computer program code that may be used to implement a method for automatically identifying a project's staffing-availability risk in accordance with embodiments of the present invention.FIG. 1 refers to objects 101-117. - Aspects of the present invention may take the form of an entirely hardware embodiment, an entirely software embodiment (including firmware, resident software, microcode, etc.) or an embodiment combining software and hardware aspects that may all generally be referred to herein as a “circuit,” “module,” or “system.”
- The present invention may be a system, a method, and/or a computer program product. The computer program product may include a computer readable storage medium (or media) having computer readable program instructions thereon for causing a processor to carry out aspects of the present invention.
- The computer readable storage medium can be a tangible device that can retain and store instructions for use by an instruction execution device. The computer readable storage medium may be, for example, but is not limited to, an electronic storage device, a magnetic storage device, an optical storage device, an electromagnetic storage device, a semiconductor storage device, or any suitable combination of the foregoing. A non-exhaustive list of more specific examples of the computer readable storage medium includes the following: a portable computer diskette, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or Flash memory), a static random access memory (SRAM), a portable compact disc read-only memory (CD-ROM), a digital versatile disk (DVD), a memory stick, a floppy disk, a mechanically encoded device such as punch-cards or raised structures in a groove having instructions recorded thereon, and any suitable combination of the foregoing. A computer readable storage medium, as used herein, is not to be construed as being transitory signals per se, such as radio waves or other freely propagating electromagnetic waves, electromagnetic waves propagating through a waveguide or other transmission media (e.g., light pulses passing through a fiber-optic cable), or electrical signals transmitted through a wire.
- Computer readable program instructions described herein can be downloaded to respective computing/processing devices from a computer readable storage medium or to an external computer or external storage device via a network, for example, the Internet, a local area network, a wide area network and/or a wireless network. The network may comprise copper transmission cables, optical transmission fibers, wireless transmission, routers, firewalls, switches, gateway computers and/or edge servers. A network adapter card or network interface in each computing/processing device receives computer readable program instructions from the network and forwards the computer readable program instructions for storage in a computer readable storage medium within the respective computing/processing device.
- Computer readable program instructions for carrying out operations of the present invention may be assembler instructions, instruction-set-architecture (ISA) instructions, machine instructions, machine dependent instructions, microcode, firmware instructions, state-setting data, or either source code or object code written in any combination of one or more programming languages, including an object oriented programming language such as Smalltalk, C++ or the like, and conventional procedural programming languages, such as the “C” programming language or similar programming languages. The computer readable program instructions may execute entirely on the user's computer, partly on the user's computer, as a stand-alone software package, partly on the user's computer and partly on a remote computer or entirely on the remote computer or server. In the latter scenario, the remote computer may be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or the connection may be made to an external computer (for example, through the Internet using an Internet Service Provider). In some embodiments, electronic circuitry including, for example, programmable logic circuitry, field-programmable gate arrays (FPGA), or programmable logic arrays (PLA) may execute the computer readable program instructions by utilizing state information of the computer readable program instructions to personalize the electronic circuitry, in order to perform aspects of the present invention.
- Aspects of the present invention are described herein with reference to flowchart illustrations and/or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of the invention. It will be understood that each block of the flowchart illustrations and/or block diagrams, and combinations of blocks in the flowchart illustrations and/or block diagrams, can be implemented by computer readable program instructions.
- These computer readable program instructions may be provided to a processor of a general purpose computer, special purpose computer, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, create means for implementing the functions/acts specified in the flowchart and/or block diagram block or blocks. These computer readable program instructions may also be stored in a computer readable storage medium that can direct a computer, a programmable data processing apparatus, and/or other devices to function in a particular manner, such that the computer readable storage medium having instructions stored therein comprises an article of manufacture including instructions which implement aspects of the function/act specified in the flowchart and/or block diagram block or blocks.
- The computer readable program instructions may also be loaded onto a computer, other programmable data processing apparatus, or other device to cause a series of operational steps to be performed on the computer, other programmable apparatus or other device to produce a computer implemented process, such that the instructions which execute on the computer, other programmable apparatus, or other device implement the functions/acts specified in the flowchart and/or block diagram block or blocks.
- The flowchart and block diagrams in the figures illustrate the architecture, functionality, and operation of possible implementations of systems, methods, and computer program products according to various embodiments of the present invention. In this regard, each block in the flowchart or block diagrams may represent a module, segment, or portion of instructions, which comprises one or more executable instructions for implementing the specified logical function(s). In some alternative implementations, the functions noted in the block may occur out of the order noted in the figures. For example, two blocks shown in succession may, in fact, be executed substantially concurrently, or the blocks may sometimes be executed in the reverse order, depending upon the functionality involved. It will also be noted that each block of the block diagrams and/or flowchart illustration, and combinations of blocks in the block diagrams and/or flowchart illustration, can be implemented by special purpose hardware-based systems that perform the specified functions or acts or carry out combinations of special purpose hardware and computer instructions.
- In
FIG. 1 ,computer system 101 comprises aprocessor 103 coupled through one or more I/O Interfaces 109 to one or more hardwaredata storage devices 111 and one or more I/O devices - Hardware
data storage devices devices 113, such as keyboards, scanners, handheld telecommunications devices, touch-sensitive displays, tablets, biometric readers, joysticks, trackballs, or computer mice; andoutput devices 115, which may comprise, but are not limited to printers, plotters, tablets, mobile telephones, displays, or sound-producing devices.Data storage devices input devices 113, andoutput devices 115 may be located either locally or at remote sites from which they are connected to I/O Interface 109 through a network interface. -
Storage devices 117 may comprise any combination of local and remote nontransitory, virtual or real, storage media that may be distributed among multiple geographical locations, implemented on different platforms, or store data in different formats. This stored data may comprise any sort of current or historical records that a business deems relevant to project-staffing requirements. As will be discussed inFIG. 2 , these records may, for example, identify accuracy of past predictions of resource supply or demand, staff attrition rate, start-date slippage, or other implementation-dependent data that may be a function of business, technical, or financial constraints. In some embodiments, thesedevices 117 may include, but are not limited to, virtual or real computing or storage systems that store databases and logs at multiple locations across an enterprise network or cloud-computing platform. -
Processor 103 may also be connected to one ormore memory devices 105, which may include, but are not limited to, Dynamic RAM (DRAM), Static RAM (SRAM), Programmable Read-Only Memory (PROM), Field-Programmable Gate Arrays (FPGA), Secure Digital memory cards, SIM cards, or other types of memory devices. - At least one
memory device 105 contains storedcomputer program code 107, which is a computer program that comprises computer-executable instructions. The stored computer program code includes a program that implements a method for automatically identifying a project's staffing-availability risk in accordance with embodiments of the present invention, and may implement other embodiments described in this specification, including the methods illustrated inFIGS. 1-2 . Thedata storage devices 111 may store thecomputer program code 107.Computer program code 107 stored in thestorage devices 111 is configured to be executed byprocessor 103 via thememory devices 105.Processor 103 executes the storedcomputer program code 107. - In some embodiments, rather than being stored and accessed from a hard drive, optical disc or other writeable, rewriteable, or removable hardware data-
storage device 111, storedcomputer program code 107 may be stored on a static, nonremovable, read-only storage medium such as a Read-Only Memory (ROM)device 105, or may be accessed byprocessor 103 directly from such a static, nonremovable, read-only medium 105. Similarly, in some embodiments, storedcomputer program code 107 may be stored as computer-readable firmware 105, or may be accessed byprocessor 103 directly fromsuch firmware 105, rather than from a more dynamic or removable hardware data-storage device 111, such as a hard drive or optical disc. - Thus the present invention discloses a process for supporting computer infrastructure, integrating, hosting, maintaining, and deploying computer-readable code into the
computer system 101, wherein the code in combination with thecomputer system 101 is capable of performing a method for automatically identifying a project's staffing-availability risk. - Any of the components of the present invention could be created, integrated, hosted, maintained, deployed, managed, serviced, supported, etc. by a service provider who offers to facilitate a method for automatically identifying a project's staffing-availability risk. Thus the present invention discloses a process for deploying or integrating computing infrastructure, comprising integrating computer-readable code into the
computer system 101, wherein the code in combination with thecomputer system 101 is capable of performing a method for automatically identifying a project's staffing-availability risk. - One or more data storage units 111 (or one or more additional memory devices not shown in
FIG. 1 ) may be used as a computer-readable hardware storage device having a computer-readable program embodied therein and/or having other data stored therein, wherein the computer-readable program comprises storedcomputer program code 107. Generally, a computer program product (or, alternatively, an article of manufacture) ofcomputer system 101 may comprise the computer-readable hardware storage device. - While it is understood that
program code 107 for automatically identifying a project's staffing-availability risk may be deployed by manually loading theprogram code 107 directly into client, server, and proxy computers (not shown) by loading theprogram code 107 into a computer-readable storage medium (e.g., computer data storage device 111),program code 107 may also be automatically or semi-automatically deployed intocomputer system 101 by sendingprogram code 107 to a central server (e.g., computer system 101) or to a group of central servers.Program code 107 may then be downloaded into client computers (not shown) that will executeprogram code 107. - Alternatively,
program code 107 may be sent directly to the client computer via e-mail.Program code 107 may then either be detached to a directory on the client computer or loaded into a directory on the client computer by an e-mail option that selects a program that detachesprogram code 107 into the directory. - Another alternative is to send
program code 107 directly to a directory on the client computer hard drive. If proxy servers are configured, the process selects the proxy server code, determines on which computers to place the proxy servers' code, transmits the proxy server code, and then installs the proxy server code on the proxy computer.Program code 107 is then transmitted to the proxy server and stored on the proxy server. - In one embodiment,
program code 107 for automatically identifying a project's staffing-availability risk is integrated into a client, server and network environment by providing forprogram code 107 to coexist with software applications (not shown), operating systems (not shown) and network operating systems software (not shown) and then installingprogram code 107 on the clients and servers in the environment whereprogram code 107 will function. - The first step of the aforementioned integration of code included in
program code 107 is to identify any software on the clients and servers, including the network operating system (not shown), whereprogram code 107 will be deployed that are required byprogram code 107 or that work in conjunction withprogram code 107. This identified software includes the network operating system, where the network operating system comprises software that enhances a basic operating system by adding networking features. Next, the software applications and version numbers are identified and compared to a list of software applications and correct version numbers that have been tested to work withprogram code 107. A software application that is missing or that does not match a correct version number is upgraded to the correct version. - A program instruction that passes parameters from
program code 107 to a software application is checked to ensure that the instruction's parameter list matches a parameter list required by theprogram code 107. Conversely, a parameter passed by the software application toprogram code 107 is checked to ensure that the parameter matches a parameter required byprogram code 107. The client and server operating systems, including the network operating systems, are identified and compared to a list of operating systems, version numbers, and network software programs that have been tested to work withprogram code 107. An operating system, version number, or network software program that does not match an entry of the list of tested operating systems and version numbers is upgraded to the listed level on the client computers and upgraded to the listed level on the server computers. - After ensuring that the software, where
program code 107 is to be deployed, is at a correct version level that has been tested to work withprogram code 107, the integration is completed by installingprogram code 107 on the clients and servers. - Embodiments of the present invention may be implemented as a method performed by a processor of a computer system, as a computer program product, as a computer system, or as a processor-performed process or service for supporting computer infrastructure.
-
FIG. 2 is a flow chart that shows steps of an embodiment of the present invention that automatically identify a project's staffing availability risk.FIG. 2 shows steps 200-280. - In
step 200, a component of a computerized project-management system receives a proposed project-staffing plan. This plan will include descriptions of staffing-resource requirements that may each specify: -
- a required staffing resource which may comprise: a specific worker or class of worker, such as a specifically named engineer, a software designer, or a network specialist; or a skill, such as database administration or facility maintenance; and
- a duration of time during which the required staffing resource must be available
- This proposed plan may identify a large number of required resources and may further identify prospective sources for some or all of the required resources. In one example, a proposed plan may require sixty computer programmers organized into four groups, each of which is associated with a different type of software, and each of which is only available from one particular Engineering Department.
- In
step 210, the system responds to receiving the proposed plan by requesting and receiving resource-supply data. This data may be gathered from any number of sources and may be structured or organized in a variety of compatible or incompatible formats. In the preceding example, if the proposed project-staffing plan requires sixty programmers associated with four types of skill sets and four corresponding Engineering groups, the system in this step may request personnel-scheduling records from twelve sites at which the four Engineering Departments maintain staff. The requested information may reside in numerous databases and logs stored on a variety of platforms, such as Windows Server-based database servers, Linux database servers, a distributed human-resource system running under a virtual operating system, and a set of flat-files contained in a transaction-processing system's archived transaction log. - Regardless of implementation details, which are known to those skilled in the art, this retrieved data will identify availability of the requested staffing resources at the times they will be needed by the proposed project plan.
- In
step 220, the system further responds to receiving the proposed plan by requesting and receiving resource-demand data. Like the resource-availability data, this demand data may be gathered from any number of sources and may be structured or organized in a variety of compatible or incompatible formats. The requested resource-demand information may reside in numerous databases and logs stored on a variety of platforms, such as Windows Server-based database servers, Linux database servers, a distributed human-resource system running under a virtual operating system, and a set of flat-files contained in a transaction-processing system's archived transaction log. This demand information will be described in greater detail below. - A more simple project-planning procedure might at this point attempt to merely match supply and demand figures in order to determine which staffing requirements can be satisfied. If, for example, received records unequivocally state that only three mechanical engineers will be available during March, 2016 in order to satisfy the proposed project plan's requirement for six mechanical engineers, then this simpler procedure would merely identify that the requirement cannot be satisfied. Such a procedure could provide little or no guidance to a project manager seeking to determine whether varying a parameter of the project plan would increase a likelihood that sufficient engineering resources would be available when needed.
- Steps 230-270 of the present invention, however, perform a more sophisticated set of adjustments that may more accurately determine likely real-world project requirements and resource availabilities. As described below, these adjustments are performed in response to receiving the most current resource-availability and demand figures in the most recent iteration of
steps - In
step 230, the system begins analyzing and applying results of the analysis to the proposed project plan. In this step, the system determines whether to adjust the project's proposed start date. In some embodiments, this adjustment may ripple to other dates associated with the project, such as a start date of a particular project task, or a structure of a critical path that is defined as a function of a date associated with one or more tasks on the critical path. - The computerized system may adjust the proposed project start date by performing a statistical or other analysis upon data that compares planned and actual start dates of previous projects. This analysis may be a further function of other parameters, such as a location, time, or business function associated with a project.
- In one example, if the system received a proposed plan in
step 200 that requires electrical engineers to be available at a Canadian work site, the system instep 230 may analyze past-project data received instep 220 to determine that similar engineering projects started over the last two years at the same (or a similar) site actually started on average two weeks later than the projects scheduled start date. The system might then adjust the project start date, or the start dates of all or some of the tasks comprised by the project, by two weeks. - In a variation of this example, if the proposed project includes tasks unrelated to electrical engineering, the system in this step may adjust start dates of only those tasks that require electrical engineering skills, or dates of those tasks that depend upon tasks that require electrical engineering skills.
- In some cases, one or more start dates may be adjusted as a function of data received in
steps - Other variations are possible, using computerized statistical methods known to those skilled in the art, in order to infer a most likely starting-date adjustment for the proposed project.
- At the conclusion of
step 230, the system will have adjusted the start date of the project, and may have further adjusted dates associated with one or more tasks of the project, and these adjustments will have been performed automatically as a function of components of data received insteps - In
step 240, the computerized system analyzes demand data received instep 220 to identify “win odds” characteristics of the proposed project. Here, a project's win odds identifies a likelihood that the project's expected staffing requirements will actually materialize. This may be a function of the project's likelihood to be approved by management, of the likelihood that a client may sign a contract necessary to initiate the project, or that the project will actually require the resources identified in the proposed project plan. In one example, if a client has already signed a contract authorizing the commencement of a project, then that project may be assigned win odds of 100%. If, on the other hand, an unsigned projected is awaiting a commitment from a client that has historically accepted only 10% of proposed projects, that project might be assigned significantly lower win odds. - In some cases, a project's win odds may have been manually entered or otherwise identified by a sales-team member, a manager, a customer representative, or other worker. In other implementations, the project's win odds may be determined by more complex, business-specific or implementation-specific, functions of parameters that may include: the location or country of origin of the project site or of a client, a project history of a particular client, or of extrinsic financial, business, or market conditions. These functions may be defined by methods known to those skilled in the art, or known to those with expert knowledge of the project's goals or of related business priorities.
- In one example, if an external “unsigned” project (one that has been offered to a client that has not yet signed a project contract) is deemed in
step 240 to have 70% win odds then that project's requirement for ten analysts in May, 2015 might be adjusted to require only seven analysts. Such an adjustment would correspondingly increase an availability of analysts during that month. So, if the proposed project plan identifies a requirement for four of eleven analysts during May, 2015, lowering the unsigned project's requirement from ten analysts to seven analysts would increase a likelihood that the proposed project plan would be able to secure the four analysts it needs during that May. - The system computes win odds for some or all projects and resource demands that may compete for resources identified by the proposed project plan. At the conclusion of
step 240, the system will thus have adjusted the projected demand for staffing resources that may reduce the amount of resources available to the proposed project. - In
step 250, the system reviews historical attrition records received instep - In one example, the received data may indicate that one class of machine operators working in the United Kingdom has experienced, on average, 5% attrition during the month of December during the past three years. If the proposed project-staffing plan requires this class of workers during a future December (after any date adjustments in step 230), then the system will reduce the expected number of available machinists by 5% when determining in step 280 a likelihood that the project's December staffing requirements can be met.
- In
step 260, the system performs another adjustment to the resource-supply information received in steep 210 by considering “roll-off accuracies” of required staffing resource. Here, a resource's roll-off accuracy identifies an accuracy of a projection of a worker's availability start date if that availability commences when the worker completes another project. - Consider, for example, an NC operator who, because of commitments to other project work through Feb. 18, 2016, is expected to become available to the proposed project on Feb. 19, 2016. The system, in this step, may perform a statistical analysis of past project-completion dates of workers who are similar to the NC operator. If, for example, workers with the same job skill, working at the same location, have historically completed projects on average one week late, then the system in this step may adjust the NC operator's availability to begin on February 26, rather than February 19. In other cases, additional weightings or other statistical factors may result in an adjustment other than one week, but which is nonetheless a function of the historical roll-off accuracy statistics extracted from the data received in
step 210. - Although some embodiments perform this analysis on a class of workers and apply the results to a required individual, other embodiments may analyze an individual's historic performance patterns, or may apply the results of a roll-off accuracy analysis to an entire class of workers.
- In
step 270, the system identifies and implements business rules to prioritize or adjust staffing-resource demands inferred from the information received instep 220. This prioritization allows resources to be allocated to competing tasks or projects such that the most important or the most likely requirements are met first. Other business rules may place further constraints upon an embodiment of the present invention. One such rule might, for example, limit staffing analyses to a specific period, such as forty weeks or eighteen months from the current day. Such a limitation would prevent the system from considering staffing requirements that are expected to materialize too far in the future to be reliably analyzed. - Prioritization business rules may, for example, be used to divide projects or project tasks into categories that are each associated with a resource-allocation priority. When competing for a particular resource, that resource would be more likely awarded to a project or task that has a higher priority.
- As mentioned above, projects and tasks may be divided into “signed” and “unsigned” categories, as a function of whether a client has signed a contract required to initiate the project or task. Here, a signed project or task would always have a higher priority than an unsigned project or task. Furthermore, as mentioned in
step 240, an unsigned project or task associated with higher win odds may be assigned a higher priority than one that is associated with lower win odds. Other prioritization schemes may be added to this step, as desired by a project manager or system designer. - In
step 280, the system performs a probability feasibility analysis that determines a likelihood that the proposed project-staffing plan will be able to successfully access the staffing resources it needs at the required times. This likelihood may be expressed as a single number (a “risk score”) or as a set or table of numbers. In some embodiments, some or all tasks may each be assigned a specific risk score. - This probability analysis is performed via straightforward operational functions that compare the plan's staffing demands to projected resource availability, where both the demand and availability figures have been adjusted in steps 220-270.
- The risk score may be a unitless number, or may be expressed as a percent probability, or in any other format that clearly represents relative likelihoods of project success.
- In some embodiments, the system may then allow a user to modify one or more characteristics of the proposed project-staffing plan and resubmit it to the system. The method of steps 200-280 would then repeat. In some embodiments, the system might, in this iteration, reuse the data received in the
previous iteration steps steps - In some embodiments, the system will allow a user to repeatedly vary one or more parameters of its proposed staffing plan, with the method of steps 200-280 repeating once for each variation. In this way, a user may interactively test “what-if” scenarios in order to identify a staffing plan that has an acceptable likelihood of success or that satisfies other business, financial, or technical constraints.
- In this way, a user may use a computerized project-management system based on an embodiment of the present invention to optimize a project-staffing plan such that the optimized plan is characterized by one or more sufficiently low risk scores representing a sufficiently high likelihood that staffing resources required by the plan will be available at times identified by the plan as being associated with each required resource; and may be further characterized as satisfying other user, business, or project constraints, such as being completed by a deadline date or falling within desired budget constraints. In such embodiments, one or more of the other constraints may be manually revised by a user in an iterative or interactive process, as described above. The system may perform this iterative process interactively, in real time or near real-time, regardless of whether the system requests and receives updated data during each repetition of
steps - In some cases, this interactive or iterative ‘what-if scenario” process may identify to a user that it is not possible, or highly unlikely, that any plan can be characterized by both a low risk score (or acceptable likelihood that required staffing resources will be timely available) and by an acceptable likelihood that the plan will satisfy the other constraints. In such cases, the present invention provides a technical advantage by reporting this conclusion to a user with greater nuance, precision, and accuracy, based on the most current information, automatically culled, aggregated, formatted, organized, and mined from possibly heterogeneous, distributed sources, than would be possible through conventional means.
- Although
FIG. 2 identifies one particular sequence of steps, embodiments of the present invention may perform steps 210-270 in an other rational order. Steps 230-260, for example, may be performed in different order in one embodiment, or steps 240-260 may be performed in a reverse order in another embodiment. In some embodiments, one or more of the adjustments of steps 220-270 may be omitted and, in other embodiments, such omissions may be selected at run time, as a function of a detection that a requested subset of the data received insteps
Claims (20)
1. A computerized project-management system comprising a computer, a memory coupled to the computer, and a set of computer-readable hardware storage devices coupled to the computer, wherein the storage devices continually receive and store updated project-management information and further store program code configured to be run by the computer via the memory to implement a method for automatically identifying a proposed project's staffing-availability risk, the method comprising:
the system receiving a proposed project-staffing plan, wherein the proposed plan identifies a set of staffing resources that will be required by the proposed project and a set of dates during which the resources of the set of staffing resources will be required;
the computer, in response to the system receiving the plan, retrieving from the storage devices updated staffing-supply data, comprised by the continually updated project information, wherein the updated supply data identifies an availability of each resource of the set of staffing resources during the dates specified by the proposed plan;
the system, in response to receiving the plan, further retrieving from the storage devices updated staffing-demand data, comprised by the continually updated project information, wherein the updated demand data identifies a set of competing demands for at least one resource of the set of staffing resources during the dates specified by the proposed plan, and wherein the set of competing demands comprises one or more staffing demands by one or more external projects that are distinct from the proposed project;
the system adjusting the updated staffing-supply data and the updated staffing-demand data as a function of the continually updated project information;
the system revising the updated staffing-demand data as a function of a priority assigned to one or more of the external projects;
the system determining a likelihood that the set of staffing resources will be available to the proposed project on the dates identified by the proposed project plan, wherein the determining is performed as a function of the adjusting.
2. The system of claim 1 , wherein the adjusting comprises two or more of the steps:
the system adjusting the proposed project's start date, as identified by the proposed plan, as a function of a difference between a planned start date of a previously started project and an actual start date of the previously started project, wherein the planned start date and the actual start date are comprised by the continually updated project information,
the system adjusting a competing demand of the set of competing demands as a function of a chance that one or more of the external projects will not be performed, wherein the chance is automatically inferred from the continually updated project information,
the system adjusting an availability of a first staffing resource of the set of staffing resources as a function of a risk that the first resource will be reduced by personnel attrition during a period of time associated by the proposed plan with the first staffing resource, wherein the risk is automatically inferred from the continually updated project information, and
the system adjusting an availability of a second staffing resource of the set of staffing resources as a function of a probability that a prior commitment of the second staffing resource will end at a time later than an earliest availability date of the second staffing resource identified by the proposed plan.
3. The system of claim 1 , wherein the revising comprises:
the system identifying a set of prioritization rules from the continually updated project information;
the system assigning a first priority to a first external project associated with a first competing demand of the set of competing demands; and
the system adjusting the first competing demand as a function of the first priority.
4. The system of claim 1 , wherein the proposed project comprises a set of tasks, and wherein the adjusting comprises adjusting a first start date of a first task of the set of tasks, adjusting a first staffing-resource supply of a second staffing resource required by a second task of the set of tasks, or a first competing demand upon a third staffing resource required by a third task of the set of tasks, wherein the first start date, the first staffing-resource supply, and the first competing demand are inferred from the continually updated project information.
5. The system of claim 4 , further comprising:
the system further determining a task likelihood that a required task resource of the set of staffing resources will be available at a time identified by the proposed plan, wherein the required task resource is identified by the proposed plan as being required in order to timely perform the first, second, or third task, and wherein the further determining is performed as a function of the adjusting; and
the system reporting the task likelihood to the user as a task risk score.
6. The system of claim 1 , further comprising:
the system reporting the likelihood to the user as a risk score.
7. The system of claim 6 , further comprising:
the system receiving, in response to the reporting, a user-selected constraint on the project; and
the system repeating the retrieving, the further retrieving, the adjusting, the revising, the determining, and the reporting, wherein the retrieving and further retrieving retrieve newly updated data, and wherein the repeating does not adjust or revise the user-selected constraint.
8. The system of claim 7 , wherein the user-selected constraint requires the project to be completed within a user-specified time, at no greater than a user-specified cost, or by consuming no more than a user-specified amount of a resource other than a staffing resource.
9. A method for automatically identifying a proposed project's staffing-availability risk, the method comprising:
a computerized project-management system receiving a proposed project-staffing plan, wherein the system comprises a computer and a set of computer-readable hardware storage devices that continually receive and store updated project-management information, and wherein the proposed plan identifies a set of staffing resources that will be required by the proposed project and a set of dates during which the resources of the set of staffing resources will be required;
the computer, in response to the system receiving the plan, retrieving from the storage devices updated staffing-supply data, comprised by the continually updated project information, wherein the updated supply data identifies an availability of each resource of the set of staffing resources during the dates specified by the proposed plan;
the computer, in response to receiving the plan, further retrieving from the storage devices updated staffing-demand data, comprised by the continually updated project information, wherein the updated demand data identifies a set of competing demands for at least one resource of the set of staffing resources during the dates specified by the proposed plan, and wherein the set of competing demands comprises one or more staffing demands by one or more external projects that are distinct from the proposed project;
the system adjusting the updated staffing-supply data and the updated staffing-demand data as a function of the continually updated project information;
the system revising the updated staffing-demand data as a function of a priority assigned to one or more of the external projects;
the system determining a likelihood that the set of staffing resources will be available to the proposed project on the dates identified by the proposed project plan, wherein the determining is performed as a function of the adjusting.
10. The method of claim 9 , wherein the adjusting comprises two or more of the steps:
the system adjusting the proposed project's start date, as identified by the proposed plan, as a function of a difference between a planned start date of a previously started project and an actual start date of the previously started project, wherein the planned start date and the actual start date are comprised by the continually updated project information,
the system adjusting a competing demand of the set of competing demands as a function of a chance that one or more of the external projects will not be performed, wherein the chance is automatically inferred from the continually updated project information,
the system adjusting an availability of a first staffing resource of the set of staffing resources as a function of a risk that the first resource will be reduced by personnel attrition during a period of time associated by the proposed plan with the first staffing resource, wherein the risk is automatically inferred from the continually updated project information, and
the system adjusting an availability of a second staffing resource of the set of staffing resources as a function of a probability that a prior commitment of the second staffing resource will end at a time later than an earliest availability date of the second staffing resource identified by the proposed plan.
11. The method of claim 9 , wherein the revising comprises:
the system identifying a set of prioritization rules from the continually updated project information;
the system assigning a first priority to a first external project associated with a first competing demand of the set of competing demands; and
the system adjusting the first competing demand as a function of the first priority.
12. The method of claim 9 , wherein the proposed project comprises a set of tasks, and wherein the adjusting comprises adjusting a first start date of a first task of the set of tasks, adjusting a first staffing-resource supply of a second staffing resource required by a second task of the set of tasks, or a first competing demand upon a third staffing resource required by a third task of the set of tasks, wherein the first start date, the first staffing-resource supply, and the first competing demand are inferred from the continually updated project information.
13. The method of claim 9 , further comprising:
the system reporting the likelihood to the user as a risk score.
14. The method of claim 13 , further comprising:
the system receiving, in response to the reporting, a user-selected constraint on the project; and
the system repeating the retrieving, the further retrieving, the adjusting, the revising, the determining, and the reporting, wherein the retrieving and further retrieving retrieve newly updated data, and wherein the repeating does not adjust or revise the user-selected constraint.
15. The method of claim 9 , further comprising providing at least one support service for at least one of creating, integrating, hosting, maintaining, and deploying computer-readable program code in the computer system, wherein the computer-readable program code in combination with the computer system is configured to implement the receiving, retrieving, further retrieving, adjusting, revising, and determining.
16. A computer program product, comprising a computer-readable hardware storage device having a computer-readable program code stored therein, the program code configured to be executed by a computerized project-management system comprising a computer, a memory coupled to the computer, and a set of computer-readable hardware storage devices coupled to the computer, wherein the storage devices continually receive and store updated project-management information and further store program code configured to be run by the computer via the memory to implement a method for automatically identifying a proposed project's staffing-availability risk, the method comprising:
the system receiving a proposed project-staffing plan, wherein the proposed plan identifies a set of staffing resources that will be required by the proposed project and a set of dates during which the resources of the set of staffing resources will be required;
the computer, in response to the system receiving the plan, retrieving from the storage devices updated staffing-supply data, comprised by the continually updated project information, wherein the updated supply data identifies an availability of each resource of the set of staffing resources during the dates specified by the proposed plan;
the system, in response to receiving the plan, further retrieving from the storage devices updated staffing-demand data, comprised by the continually updated project information, wherein the updated demand data identifies a set of competing demands for at least one resource of the set of staffing resources during the dates specified by the proposed plan, and wherein the set of competing demands comprises one or more staffing demands by one or more external projects that are distinct from the proposed project;
the system adjusting the updated staffing-supply data and the updated staffing-demand data as a function of the continually updated project information;
the system revising the updated staffing-demand data as a function of a priority assigned to one or more of the external projects;
the system determining a likelihood that the set of staffing resources will be available to the proposed project on the dates identified by the proposed project plan, wherein the determining is performed as a function of the adjusting.
17. The computer program product of claim 16 , wherein the adjusting comprises two or more of the steps:
the system adjusting the proposed project's start date, as identified by the proposed plan, as a function of a difference between a planned start date of a previously started project and an actual start date of the previously started project, wherein the planned start date and the actual start date are comprised by the continually updated project information,
the system adjusting a competing demand of the set of competing demands as a function of a chance that one or more of the external projects will not be performed, wherein the chance is automatically inferred from the continually updated project information,
the system adjusting an availability of a first staffing resource of the set of staffing resources as a function of a risk that the first resource will be reduced by personnel attrition during a period of time associated by the proposed plan with the first staffing resource, wherein the risk is automatically inferred from the continually updated project information, and
the system adjusting an availability of a second staffing resource of the set of staffing resources as a function of a probability that a prior commitment of the second staffing resource will end at a time later than an earliest availability date of the second staffing resource identified by the proposed plan.
18. The computer program product of claim 16 , wherein the revising comprises:
the system identifying a set of prioritization rules from the continually updated project information;
the system assigning a first priority to a first external project associated with a first competing demand of the set of competing demands; and
the system adjusting the first competing demand as a function of the first priority.
19. The computer program product of claim 16 , further comprising:
the system reporting the likelihood to the user as a risk score.
20. The computer program product of claim 19 , further comprising:
the system receiving, in response to the reporting, a user-selected constraint on the project; and
the system repeating the retrieving, the further retrieving, the adjusting, the revising, the determining, and the reporting, wherein the retrieving and further retrieving retrieve newly updated data, and wherein the repeating does not adjust or revise the user-selected constraint.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US14/672,352 US20160292621A1 (en) | 2015-03-30 | 2015-03-30 | Automatically identifying a project's staffing-availability risk |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US14/672,352 US20160292621A1 (en) | 2015-03-30 | 2015-03-30 | Automatically identifying a project's staffing-availability risk |
Publications (1)
Publication Number | Publication Date |
---|---|
US20160292621A1 true US20160292621A1 (en) | 2016-10-06 |
Family
ID=57017288
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US14/672,352 Abandoned US20160292621A1 (en) | 2015-03-30 | 2015-03-30 | Automatically identifying a project's staffing-availability risk |
Country Status (1)
Country | Link |
---|---|
US (1) | US20160292621A1 (en) |
Cited By (131)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20170364850A1 (en) * | 2016-06-17 | 2017-12-21 | Accenture Global Solutions Limited | Workforce strategy insights |
CN110335004A (en) * | 2019-05-08 | 2019-10-15 | 重庆天蓬网络有限公司 | A kind of product and engineering relationships solution based on responsibility system |
US10846433B2 (en) | 2016-06-10 | 2020-11-24 | OneTrust, LLC | Data processing consent management systems and related methods |
US10846261B2 (en) | 2016-06-10 | 2020-11-24 | OneTrust, LLC | Data processing systems for processing data subject access requests |
US10848523B2 (en) | 2016-06-10 | 2020-11-24 | OneTrust, LLC | Data processing systems for data-transfer risk identification, cross-border visualization generation, and related methods |
US10853501B2 (en) | 2016-06-10 | 2020-12-01 | OneTrust, LLC | Data processing and scanning systems for assessing vendor risk |
US10853859B2 (en) | 2016-04-01 | 2020-12-01 | OneTrust, LLC | Data processing systems and methods for operationalizing privacy compliance and assessing the risk of various respective privacy campaigns |
US10867072B2 (en) | 2016-06-10 | 2020-12-15 | OneTrust, LLC | Data processing systems for measuring privacy maturity within an organization |
US10867007B2 (en) | 2016-06-10 | 2020-12-15 | OneTrust, LLC | Data processing systems for fulfilling data subject access requests and related methods |
US10873606B2 (en) | 2016-06-10 | 2020-12-22 | OneTrust, LLC | Data processing systems for data-transfer risk identification, cross-border visualization generation, and related methods |
US10878127B2 (en) | 2016-06-10 | 2020-12-29 | OneTrust, LLC | Data subject access request processing systems and related methods |
US10885485B2 (en) | 2016-06-10 | 2021-01-05 | OneTrust, LLC | Privacy management systems and methods |
US10896394B2 (en) | 2016-06-10 | 2021-01-19 | OneTrust, LLC | Privacy management systems and methods |
US10909265B2 (en) | 2016-06-10 | 2021-02-02 | OneTrust, LLC | Application privacy scanning systems and related methods |
US10909488B2 (en) | 2016-06-10 | 2021-02-02 | OneTrust, LLC | Data processing systems for assessing readiness for responding to privacy-related incidents |
US10929559B2 (en) | 2016-06-10 | 2021-02-23 | OneTrust, LLC | Data processing systems for data testing to confirm data deletion and related methods |
US10944725B2 (en) | 2016-06-10 | 2021-03-09 | OneTrust, LLC | Data processing systems and methods for using a data model to select a target data asset in a data migration |
US10949565B2 (en) | 2016-06-10 | 2021-03-16 | OneTrust, LLC | Data processing systems for generating and populating a data inventory |
US10949170B2 (en) | 2016-06-10 | 2021-03-16 | OneTrust, LLC | Data processing systems for integration of consumer feedback with data subject access requests and related methods |
US10949567B2 (en) | 2016-06-10 | 2021-03-16 | OneTrust, LLC | Data processing systems for fulfilling data subject access requests and related methods |
US10949544B2 (en) | 2016-06-10 | 2021-03-16 | OneTrust, LLC | Data processing systems for data transfer risk identification and related methods |
US10963591B2 (en) | 2018-09-07 | 2021-03-30 | OneTrust, LLC | Data processing systems for orphaned data identification and deletion and related methods |
US10970371B2 (en) | 2016-06-10 | 2021-04-06 | OneTrust, LLC | Consent receipt management systems and related methods |
US10972509B2 (en) | 2016-06-10 | 2021-04-06 | OneTrust, LLC | Data processing and scanning systems for generating and populating a data inventory |
US10970675B2 (en) | 2016-06-10 | 2021-04-06 | OneTrust, LLC | Data processing systems for generating and populating a data inventory |
US10984132B2 (en) | 2016-06-10 | 2021-04-20 | OneTrust, LLC | Data processing systems and methods for populating and maintaining a centralized database of personal data |
US10997315B2 (en) | 2016-06-10 | 2021-05-04 | OneTrust, LLC | Data processing systems for fulfilling data subject access requests and related methods |
US10997542B2 (en) | 2016-06-10 | 2021-05-04 | OneTrust, LLC | Privacy management systems and methods |
US10997318B2 (en) | 2016-06-10 | 2021-05-04 | OneTrust, LLC | Data processing systems for generating and populating a data inventory for processing data access requests |
US11004125B2 (en) | 2016-04-01 | 2021-05-11 | OneTrust, LLC | Data processing systems and methods for integrating privacy information management systems with data loss prevention tools or other tools for privacy design |
US11023616B2 (en) | 2016-06-10 | 2021-06-01 | OneTrust, LLC | Data processing systems for identifying, assessing, and remediating data processing risks using data modeling techniques |
US11025675B2 (en) | 2016-06-10 | 2021-06-01 | OneTrust, LLC | Data processing systems and methods for performing privacy assessments and monitoring of new versions of computer code for privacy compliance |
US11023842B2 (en) | 2016-06-10 | 2021-06-01 | OneTrust, LLC | Data processing systems and methods for bundled privacy policies |
US11030274B2 (en) | 2016-06-10 | 2021-06-08 | OneTrust, LLC | Data processing user interface monitoring systems and related methods |
US11036882B2 (en) | 2016-06-10 | 2021-06-15 | OneTrust, LLC | Data processing systems for processing and managing data subject access in a distributed environment |
US11038925B2 (en) | 2016-06-10 | 2021-06-15 | OneTrust, LLC | Data processing systems for data-transfer risk identification, cross-border visualization generation, and related methods |
US11036771B2 (en) | 2016-06-10 | 2021-06-15 | OneTrust, LLC | Data processing systems for generating and populating a data inventory |
US11057356B2 (en) | 2016-06-10 | 2021-07-06 | OneTrust, LLC | Automated data processing systems and methods for automatically processing data subject access requests using a chatbot |
US11062051B2 (en) | 2016-06-10 | 2021-07-13 | OneTrust, LLC | Consent receipt management systems and related methods |
US11068618B2 (en) | 2016-06-10 | 2021-07-20 | OneTrust, LLC | Data processing systems for central consent repository and related methods |
US11074367B2 (en) | 2016-06-10 | 2021-07-27 | OneTrust, LLC | Data processing systems for identity validation for consumer rights requests and related methods |
US11087260B2 (en) | 2016-06-10 | 2021-08-10 | OneTrust, LLC | Data processing systems and methods for customizing privacy training |
US11100444B2 (en) | 2016-06-10 | 2021-08-24 | OneTrust, LLC | Data processing systems and methods for providing training in a vendor procurement process |
US11134086B2 (en) | 2016-06-10 | 2021-09-28 | OneTrust, LLC | Consent conversion optimization systems and related methods |
US11138299B2 (en) | 2016-06-10 | 2021-10-05 | OneTrust, LLC | Data processing and scanning systems for assessing vendor risk |
US11138242B2 (en) | 2016-06-10 | 2021-10-05 | OneTrust, LLC | Data processing systems and methods for automatically detecting and documenting privacy-related aspects of computer software |
US11144622B2 (en) | 2016-06-10 | 2021-10-12 | OneTrust, LLC | Privacy management systems and methods |
US11146566B2 (en) | 2016-06-10 | 2021-10-12 | OneTrust, LLC | Data processing systems for fulfilling data subject access requests and related methods |
US11144670B2 (en) | 2016-06-10 | 2021-10-12 | OneTrust, LLC | Data processing systems for identifying and modifying processes that are subject to data subject access requests |
US11144675B2 (en) | 2018-09-07 | 2021-10-12 | OneTrust, LLC | Data processing systems and methods for automatically protecting sensitive data within privacy management systems |
US11151233B2 (en) | 2016-06-10 | 2021-10-19 | OneTrust, LLC | Data processing and scanning systems for assessing vendor risk |
US11157600B2 (en) | 2016-06-10 | 2021-10-26 | OneTrust, LLC | Data processing and scanning systems for assessing vendor risk |
US11188615B2 (en) | 2016-06-10 | 2021-11-30 | OneTrust, LLC | Data processing consent capture systems and related methods |
US11188862B2 (en) | 2016-06-10 | 2021-11-30 | OneTrust, LLC | Privacy management systems and methods |
IT202000013060A1 (en) | 2020-06-03 | 2021-12-03 | Stefano Pepice | CAUSATION MANAGEMENT PROCEDURE AND REAL-TIME MANAGEMENT MODEL OF INDUSTRIAL PRODUCTION |
US11200341B2 (en) | 2016-06-10 | 2021-12-14 | OneTrust, LLC | Consent receipt management systems and related methods |
US11210420B2 (en) | 2016-06-10 | 2021-12-28 | OneTrust, LLC | Data subject access request processing systems and related methods |
US11222309B2 (en) | 2016-06-10 | 2022-01-11 | OneTrust, LLC | Data processing systems for generating and populating a data inventory |
US11222139B2 (en) | 2016-06-10 | 2022-01-11 | OneTrust, LLC | Data processing systems and methods for automatic discovery and assessment of mobile software development kits |
US11222142B2 (en) | 2016-06-10 | 2022-01-11 | OneTrust, LLC | Data processing systems for validating authorization for personal data collection, storage, and processing |
US11228620B2 (en) | 2016-06-10 | 2022-01-18 | OneTrust, LLC | Data processing systems for data-transfer risk identification, cross-border visualization generation, and related methods |
US11227247B2 (en) | 2016-06-10 | 2022-01-18 | OneTrust, LLC | Data processing systems and methods for bundled privacy policies |
US11238390B2 (en) * | 2016-06-10 | 2022-02-01 | OneTrust, LLC | Privacy management systems and methods |
US11244367B2 (en) | 2016-04-01 | 2022-02-08 | OneTrust, LLC | Data processing systems and methods for integrating privacy information management systems with data loss prevention tools or other tools for privacy design |
US11244071B2 (en) | 2016-06-10 | 2022-02-08 | OneTrust, LLC | Data processing systems for use in automatically generating, populating, and submitting data subject access requests |
US11277448B2 (en) | 2016-06-10 | 2022-03-15 | OneTrust, LLC | Data processing systems for data-transfer risk identification, cross-border visualization generation, and related methods |
US11295316B2 (en) | 2016-06-10 | 2022-04-05 | OneTrust, LLC | Data processing systems for identity validation for consumer rights requests and related methods |
US11294939B2 (en) | 2016-06-10 | 2022-04-05 | OneTrust, LLC | Data processing systems and methods for automatically detecting and documenting privacy-related aspects of computer software |
US11301796B2 (en) | 2016-06-10 | 2022-04-12 | OneTrust, LLC | Data processing systems and methods for customizing privacy training |
US11301589B2 (en) | 2016-06-10 | 2022-04-12 | OneTrust, LLC | Consent receipt management systems and related methods |
US11308435B2 (en) | 2016-06-10 | 2022-04-19 | OneTrust, LLC | Data processing systems for identifying, assessing, and remediating data processing risks using data modeling techniques |
US11328092B2 (en) | 2016-06-10 | 2022-05-10 | OneTrust, LLC | Data processing systems for processing and managing data subject access in a distributed environment |
US11336697B2 (en) | 2016-06-10 | 2022-05-17 | OneTrust, LLC | Data processing systems for data-transfer risk identification, cross-border visualization generation, and related methods |
US11341447B2 (en) | 2016-06-10 | 2022-05-24 | OneTrust, LLC | Privacy management systems and methods |
US11343284B2 (en) | 2016-06-10 | 2022-05-24 | OneTrust, LLC | Data processing systems and methods for performing privacy assessments and monitoring of new versions of computer code for privacy compliance |
US11354435B2 (en) | 2016-06-10 | 2022-06-07 | OneTrust, LLC | Data processing systems for data testing to confirm data deletion and related methods |
US11354434B2 (en) | 2016-06-10 | 2022-06-07 | OneTrust, LLC | Data processing systems for verification of consent and notice processing and related methods |
US11366786B2 (en) | 2016-06-10 | 2022-06-21 | OneTrust, LLC | Data processing systems for processing data subject access requests |
US11366909B2 (en) | 2016-06-10 | 2022-06-21 | OneTrust, LLC | Data processing and scanning systems for assessing vendor risk |
US11373007B2 (en) | 2017-06-16 | 2022-06-28 | OneTrust, LLC | Data processing systems for identifying whether cookies contain personally identifying information |
US11392720B2 (en) | 2016-06-10 | 2022-07-19 | OneTrust, LLC | Data processing systems for verification of consent and notice processing and related methods |
US11397819B2 (en) | 2020-11-06 | 2022-07-26 | OneTrust, LLC | Systems and methods for identifying data processing activities based on data discovery results |
US11403377B2 (en) | 2016-06-10 | 2022-08-02 | OneTrust, LLC | Privacy management systems and methods |
US11418492B2 (en) | 2016-06-10 | 2022-08-16 | OneTrust, LLC | Data processing systems and methods for using a data model to select a target data asset in a data migration |
US11416798B2 (en) | 2016-06-10 | 2022-08-16 | OneTrust, LLC | Data processing systems and methods for providing training in a vendor procurement process |
US11416634B2 (en) | 2016-06-10 | 2022-08-16 | OneTrust, LLC | Consent receipt management systems and related methods |
US11416589B2 (en) | 2016-06-10 | 2022-08-16 | OneTrust, LLC | Data processing and scanning systems for assessing vendor risk |
US11416590B2 (en) | 2016-06-10 | 2022-08-16 | OneTrust, LLC | Data processing and scanning systems for assessing vendor risk |
US11416109B2 (en) | 2016-06-10 | 2022-08-16 | OneTrust, LLC | Automated data processing systems and methods for automatically processing data subject access requests using a chatbot |
US11438386B2 (en) | 2016-06-10 | 2022-09-06 | OneTrust, LLC | Data processing systems for data-transfer risk identification, cross-border visualization generation, and related methods |
US11436373B2 (en) | 2020-09-15 | 2022-09-06 | OneTrust, LLC | Data processing systems and methods for detecting tools for the automatic blocking of consent requests |
US11444976B2 (en) | 2020-07-28 | 2022-09-13 | OneTrust, LLC | Systems and methods for automatically blocking the use of tracking tools |
US11442906B2 (en) | 2021-02-04 | 2022-09-13 | OneTrust, LLC | Managing custom attributes for domain objects defined within microservices |
CN115062081A (en) * | 2022-06-29 | 2022-09-16 | 中国平安财产保险股份有限公司 | Artificial intelligence-based data management method, device, electronic device and medium |
US11461500B2 (en) | 2016-06-10 | 2022-10-04 | OneTrust, LLC | Data processing systems for cookie compliance testing with website scanning and related methods |
US11475136B2 (en) | 2016-06-10 | 2022-10-18 | OneTrust, LLC | Data processing systems for data transfer risk identification and related methods |
US11475165B2 (en) | 2020-08-06 | 2022-10-18 | OneTrust, LLC | Data processing systems and methods for automatically redacting unstructured data from a data subject access request |
US11481710B2 (en) | 2016-06-10 | 2022-10-25 | OneTrust, LLC | Privacy management systems and methods |
US11494515B2 (en) | 2021-02-08 | 2022-11-08 | OneTrust, LLC | Data processing systems and methods for anonymizing data samples in classification analysis |
US11520928B2 (en) | 2016-06-10 | 2022-12-06 | OneTrust, LLC | Data processing systems for generating personal data receipts and related methods |
US11526624B2 (en) | 2020-09-21 | 2022-12-13 | OneTrust, LLC | Data processing systems and methods for automatically detecting target data transfers and target data processing |
US11533315B2 (en) | 2021-03-08 | 2022-12-20 | OneTrust, LLC | Data transfer discovery and analysis systems and related methods |
US11544667B2 (en) | 2016-06-10 | 2023-01-03 | OneTrust, LLC | Data processing systems for generating and populating a data inventory |
US11544409B2 (en) | 2018-09-07 | 2023-01-03 | OneTrust, LLC | Data processing systems and methods for automatically protecting sensitive data within privacy management systems |
US11546661B2 (en) | 2021-02-18 | 2023-01-03 | OneTrust, LLC | Selective redaction of media content |
US11562097B2 (en) | 2016-06-10 | 2023-01-24 | OneTrust, LLC | Data processing systems for central consent repository and related methods |
US11562078B2 (en) | 2021-04-16 | 2023-01-24 | OneTrust, LLC | Assessing and managing computational risk involved with integrating third party computing functionality within a computing system |
US11586700B2 (en) | 2016-06-10 | 2023-02-21 | OneTrust, LLC | Data processing systems and methods for automatically blocking the use of tracking tools |
US11586762B2 (en) | 2016-06-10 | 2023-02-21 | OneTrust, LLC | Data processing systems and methods for auditing data request compliance |
US11601464B2 (en) | 2021-02-10 | 2023-03-07 | OneTrust, LLC | Systems and methods for mitigating risks of third-party computing system functionality integration into a first-party computing system |
US11620142B1 (en) | 2022-06-03 | 2023-04-04 | OneTrust, LLC | Generating and customizing user interfaces for demonstrating functions of interactive user environments |
US11625502B2 (en) | 2016-06-10 | 2023-04-11 | OneTrust, LLC | Data processing systems for identifying and modifying processes that are subject to data subject access requests |
US11636171B2 (en) | 2016-06-10 | 2023-04-25 | OneTrust, LLC | Data processing user interface monitoring systems and related methods |
CN116109116A (en) * | 2023-04-13 | 2023-05-12 | 中建安装集团有限公司 | Cloud computing-based comprehensive application program supervision control system and method |
US11651402B2 (en) | 2016-04-01 | 2023-05-16 | OneTrust, LLC | Data processing systems and communication systems and methods for the efficient generation of risk assessments |
US11651106B2 (en) | 2016-06-10 | 2023-05-16 | OneTrust, LLC | Data processing systems for fulfilling data subject access requests and related methods |
US11651104B2 (en) | 2016-06-10 | 2023-05-16 | OneTrust, LLC | Consent receipt management systems and related methods |
US11675929B2 (en) | 2016-06-10 | 2023-06-13 | OneTrust, LLC | Data processing consent sharing systems and related methods |
US11687528B2 (en) | 2021-01-25 | 2023-06-27 | OneTrust, LLC | Systems and methods for discovery, classification, and indexing of data in a native computing system |
US11727141B2 (en) | 2016-06-10 | 2023-08-15 | OneTrust, LLC | Data processing systems and methods for synching privacy-related user consent across multiple computing devices |
US11775348B2 (en) | 2021-02-17 | 2023-10-03 | OneTrust, LLC | Managing custom workflows for domain objects defined within microservices |
US11797528B2 (en) | 2020-07-08 | 2023-10-24 | OneTrust, LLC | Systems and methods for targeted data discovery |
CN117575335A (en) * | 2024-01-17 | 2024-02-20 | 成都赛力斯科技有限公司 | Vehicle development project risk monitoring method, device, system, equipment and medium |
US12045266B2 (en) | 2016-06-10 | 2024-07-23 | OneTrust, LLC | Data processing systems for generating and populating a data inventory |
US12052289B2 (en) | 2016-06-10 | 2024-07-30 | OneTrust, LLC | Data processing systems for data-transfer risk identification, cross-border visualization generation, and related methods |
US12118121B2 (en) | 2016-06-10 | 2024-10-15 | OneTrust, LLC | Data subject access request processing systems and related methods |
CN118863836A (en) * | 2024-08-02 | 2024-10-29 | 想买科技(深圳)有限公司 | Human resource management system and method based on cloud computing |
US12136055B2 (en) | 2016-06-10 | 2024-11-05 | OneTrust, LLC | Data processing systems for identifying, assessing, and remediating data processing risks using data modeling techniques |
US12153704B2 (en) | 2021-08-05 | 2024-11-26 | OneTrust, LLC | Computing platform for facilitating data exchange among computing environments |
US12265896B2 (en) | 2020-10-05 | 2025-04-01 | OneTrust, LLC | Systems and methods for detecting prejudice bias in machine-learning models |
US12299065B2 (en) | 2016-06-10 | 2025-05-13 | OneTrust, LLC | Data processing systems and methods for dynamically determining data processing consent configurations |
-
2015
- 2015-03-30 US US14/672,352 patent/US20160292621A1/en not_active Abandoned
Cited By (195)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11004125B2 (en) | 2016-04-01 | 2021-05-11 | OneTrust, LLC | Data processing systems and methods for integrating privacy information management systems with data loss prevention tools or other tools for privacy design |
US10956952B2 (en) | 2016-04-01 | 2021-03-23 | OneTrust, LLC | Data processing systems and communication systems and methods for the efficient generation of privacy risk assessments |
US12288233B2 (en) | 2016-04-01 | 2025-04-29 | OneTrust, LLC | Data processing systems and methods for integrating privacy information management systems with data loss prevention tools or other tools for privacy design |
US11651402B2 (en) | 2016-04-01 | 2023-05-16 | OneTrust, LLC | Data processing systems and communication systems and methods for the efficient generation of risk assessments |
US10853859B2 (en) | 2016-04-01 | 2020-12-01 | OneTrust, LLC | Data processing systems and methods for operationalizing privacy compliance and assessing the risk of various respective privacy campaigns |
US11244367B2 (en) | 2016-04-01 | 2022-02-08 | OneTrust, LLC | Data processing systems and methods for integrating privacy information management systems with data loss prevention tools or other tools for privacy design |
US11341447B2 (en) | 2016-06-10 | 2022-05-24 | OneTrust, LLC | Privacy management systems and methods |
US11847182B2 (en) | 2016-06-10 | 2023-12-19 | OneTrust, LLC | Data processing consent capture systems and related methods |
US11354434B2 (en) | 2016-06-10 | 2022-06-07 | OneTrust, LLC | Data processing systems for verification of consent and notice processing and related methods |
US10878127B2 (en) | 2016-06-10 | 2020-12-29 | OneTrust, LLC | Data subject access request processing systems and related methods |
US10885485B2 (en) | 2016-06-10 | 2021-01-05 | OneTrust, LLC | Privacy management systems and methods |
US10896394B2 (en) | 2016-06-10 | 2021-01-19 | OneTrust, LLC | Privacy management systems and methods |
US10909265B2 (en) | 2016-06-10 | 2021-02-02 | OneTrust, LLC | Application privacy scanning systems and related methods |
US10909488B2 (en) | 2016-06-10 | 2021-02-02 | OneTrust, LLC | Data processing systems for assessing readiness for responding to privacy-related incidents |
US10929559B2 (en) | 2016-06-10 | 2021-02-23 | OneTrust, LLC | Data processing systems for data testing to confirm data deletion and related methods |
US10944725B2 (en) | 2016-06-10 | 2021-03-09 | OneTrust, LLC | Data processing systems and methods for using a data model to select a target data asset in a data migration |
US10949565B2 (en) | 2016-06-10 | 2021-03-16 | OneTrust, LLC | Data processing systems for generating and populating a data inventory |
US10949170B2 (en) | 2016-06-10 | 2021-03-16 | OneTrust, LLC | Data processing systems for integration of consumer feedback with data subject access requests and related methods |
US10949567B2 (en) | 2016-06-10 | 2021-03-16 | OneTrust, LLC | Data processing systems for fulfilling data subject access requests and related methods |
US10949544B2 (en) | 2016-06-10 | 2021-03-16 | OneTrust, LLC | Data processing systems for data transfer risk identification and related methods |
US12299065B2 (en) | 2016-06-10 | 2025-05-13 | OneTrust, LLC | Data processing systems and methods for dynamically determining data processing consent configurations |
US10846433B2 (en) | 2016-06-10 | 2020-11-24 | OneTrust, LLC | Data processing consent management systems and related methods |
US12216794B2 (en) | 2016-06-10 | 2025-02-04 | OneTrust, LLC | Data processing systems and methods for synching privacy-related user consent across multiple computing devices |
US10970371B2 (en) | 2016-06-10 | 2021-04-06 | OneTrust, LLC | Consent receipt management systems and related methods |
US10972509B2 (en) | 2016-06-10 | 2021-04-06 | OneTrust, LLC | Data processing and scanning systems for generating and populating a data inventory |
US10970675B2 (en) | 2016-06-10 | 2021-04-06 | OneTrust, LLC | Data processing systems for generating and populating a data inventory |
US10984132B2 (en) | 2016-06-10 | 2021-04-20 | OneTrust, LLC | Data processing systems and methods for populating and maintaining a centralized database of personal data |
US10997315B2 (en) | 2016-06-10 | 2021-05-04 | OneTrust, LLC | Data processing systems for fulfilling data subject access requests and related methods |
US10997542B2 (en) | 2016-06-10 | 2021-05-04 | OneTrust, LLC | Privacy management systems and methods |
US10997318B2 (en) | 2016-06-10 | 2021-05-04 | OneTrust, LLC | Data processing systems for generating and populating a data inventory for processing data access requests |
US10867072B2 (en) | 2016-06-10 | 2020-12-15 | OneTrust, LLC | Data processing systems for measuring privacy maturity within an organization |
US11023616B2 (en) | 2016-06-10 | 2021-06-01 | OneTrust, LLC | Data processing systems for identifying, assessing, and remediating data processing risks using data modeling techniques |
US11025675B2 (en) | 2016-06-10 | 2021-06-01 | OneTrust, LLC | Data processing systems and methods for performing privacy assessments and monitoring of new versions of computer code for privacy compliance |
US11023842B2 (en) | 2016-06-10 | 2021-06-01 | OneTrust, LLC | Data processing systems and methods for bundled privacy policies |
US11030563B2 (en) | 2016-06-10 | 2021-06-08 | OneTrust, LLC | Privacy management systems and methods |
US11030327B2 (en) | 2016-06-10 | 2021-06-08 | OneTrust, LLC | Data processing and scanning systems for assessing vendor risk |
US11030274B2 (en) | 2016-06-10 | 2021-06-08 | OneTrust, LLC | Data processing user interface monitoring systems and related methods |
US11036882B2 (en) | 2016-06-10 | 2021-06-15 | OneTrust, LLC | Data processing systems for processing and managing data subject access in a distributed environment |
US11036674B2 (en) | 2016-06-10 | 2021-06-15 | OneTrust, LLC | Data processing systems for processing data subject access requests |
US11038925B2 (en) | 2016-06-10 | 2021-06-15 | OneTrust, LLC | Data processing systems for data-transfer risk identification, cross-border visualization generation, and related methods |
US11036771B2 (en) | 2016-06-10 | 2021-06-15 | OneTrust, LLC | Data processing systems for generating and populating a data inventory |
US11057356B2 (en) | 2016-06-10 | 2021-07-06 | OneTrust, LLC | Automated data processing systems and methods for automatically processing data subject access requests using a chatbot |
US11062051B2 (en) | 2016-06-10 | 2021-07-13 | OneTrust, LLC | Consent receipt management systems and related methods |
US11068618B2 (en) | 2016-06-10 | 2021-07-20 | OneTrust, LLC | Data processing systems for central consent repository and related methods |
US11070593B2 (en) | 2016-06-10 | 2021-07-20 | OneTrust, LLC | Data processing systems for data-transfer risk identification, cross-border visualization generation, and related methods |
US11074367B2 (en) | 2016-06-10 | 2021-07-27 | OneTrust, LLC | Data processing systems for identity validation for consumer rights requests and related methods |
US11087260B2 (en) | 2016-06-10 | 2021-08-10 | OneTrust, LLC | Data processing systems and methods for customizing privacy training |
US11100444B2 (en) | 2016-06-10 | 2021-08-24 | OneTrust, LLC | Data processing systems and methods for providing training in a vendor procurement process |
US11100445B2 (en) | 2016-06-10 | 2021-08-24 | OneTrust, LLC | Data processing systems for assessing readiness for responding to privacy-related incidents |
US11113416B2 (en) | 2016-06-10 | 2021-09-07 | OneTrust, LLC | Application privacy scanning systems and related methods |
US11120161B2 (en) | 2016-06-10 | 2021-09-14 | OneTrust, LLC | Data subject access request processing systems and related methods |
US11122011B2 (en) | 2016-06-10 | 2021-09-14 | OneTrust, LLC | Data processing systems and methods for using a data model to select a target data asset in a data migration |
US11120162B2 (en) | 2016-06-10 | 2021-09-14 | OneTrust, LLC | Data processing systems for data testing to confirm data deletion and related methods |
US11126748B2 (en) | 2016-06-10 | 2021-09-21 | OneTrust, LLC | Data processing consent management systems and related methods |
US11134086B2 (en) | 2016-06-10 | 2021-09-28 | OneTrust, LLC | Consent conversion optimization systems and related methods |
US11138299B2 (en) | 2016-06-10 | 2021-10-05 | OneTrust, LLC | Data processing and scanning systems for assessing vendor risk |
US11138242B2 (en) | 2016-06-10 | 2021-10-05 | OneTrust, LLC | Data processing systems and methods for automatically detecting and documenting privacy-related aspects of computer software |
US11138318B2 (en) | 2016-06-10 | 2021-10-05 | OneTrust, LLC | Data processing systems for data transfer risk identification and related methods |
US11138336B2 (en) | 2016-06-10 | 2021-10-05 | OneTrust, LLC | Data processing systems for generating and populating a data inventory |
US11144622B2 (en) | 2016-06-10 | 2021-10-12 | OneTrust, LLC | Privacy management systems and methods |
US11146566B2 (en) | 2016-06-10 | 2021-10-12 | OneTrust, LLC | Data processing systems for fulfilling data subject access requests and related methods |
US11144670B2 (en) | 2016-06-10 | 2021-10-12 | OneTrust, LLC | Data processing systems for identifying and modifying processes that are subject to data subject access requests |
US12204564B2 (en) | 2016-06-10 | 2025-01-21 | OneTrust, LLC | Data processing systems and methods for automatically detecting and documenting privacy-related aspects of computer software |
US11151233B2 (en) | 2016-06-10 | 2021-10-19 | OneTrust, LLC | Data processing and scanning systems for assessing vendor risk |
US11157600B2 (en) | 2016-06-10 | 2021-10-26 | OneTrust, LLC | Data processing and scanning systems for assessing vendor risk |
US12190330B2 (en) | 2016-06-10 | 2025-01-07 | OneTrust, LLC | Data processing systems for identity validation for consumer rights requests and related methods |
US11182501B2 (en) | 2016-06-10 | 2021-11-23 | OneTrust, LLC | Data processing systems for fulfilling data subject access requests and related methods |
US11188615B2 (en) | 2016-06-10 | 2021-11-30 | OneTrust, LLC | Data processing consent capture systems and related methods |
US11188862B2 (en) | 2016-06-10 | 2021-11-30 | OneTrust, LLC | Privacy management systems and methods |
US12164667B2 (en) | 2016-06-10 | 2024-12-10 | OneTrust, LLC | Application privacy scanning systems and related methods |
US12158975B2 (en) | 2016-06-10 | 2024-12-03 | OneTrust, LLC | Data processing consent sharing systems and related methods |
US11195134B2 (en) | 2016-06-10 | 2021-12-07 | OneTrust, LLC | Privacy management systems and methods |
US11200341B2 (en) | 2016-06-10 | 2021-12-14 | OneTrust, LLC | Consent receipt management systems and related methods |
US11210420B2 (en) | 2016-06-10 | 2021-12-28 | OneTrust, LLC | Data subject access request processing systems and related methods |
US11222309B2 (en) | 2016-06-10 | 2022-01-11 | OneTrust, LLC | Data processing systems for generating and populating a data inventory |
US11222139B2 (en) | 2016-06-10 | 2022-01-11 | OneTrust, LLC | Data processing systems and methods for automatic discovery and assessment of mobile software development kits |
US11222142B2 (en) | 2016-06-10 | 2022-01-11 | OneTrust, LLC | Data processing systems for validating authorization for personal data collection, storage, and processing |
US11228620B2 (en) | 2016-06-10 | 2022-01-18 | OneTrust, LLC | Data processing systems for data-transfer risk identification, cross-border visualization generation, and related methods |
US11227247B2 (en) | 2016-06-10 | 2022-01-18 | OneTrust, LLC | Data processing systems and methods for bundled privacy policies |
US11240273B2 (en) | 2016-06-10 | 2022-02-01 | OneTrust, LLC | Data processing and scanning systems for generating and populating a data inventory |
US11238390B2 (en) * | 2016-06-10 | 2022-02-01 | OneTrust, LLC | Privacy management systems and methods |
US11244072B2 (en) | 2016-06-10 | 2022-02-08 | OneTrust, LLC | Data processing systems for identifying, assessing, and remediating data processing risks using data modeling techniques |
US10853501B2 (en) | 2016-06-10 | 2020-12-01 | OneTrust, LLC | Data processing and scanning systems for assessing vendor risk |
US11244071B2 (en) | 2016-06-10 | 2022-02-08 | OneTrust, LLC | Data processing systems for use in automatically generating, populating, and submitting data subject access requests |
US11256777B2 (en) | 2016-06-10 | 2022-02-22 | OneTrust, LLC | Data processing user interface monitoring systems and related methods |
US11277448B2 (en) | 2016-06-10 | 2022-03-15 | OneTrust, LLC | Data processing systems for data-transfer risk identification, cross-border visualization generation, and related methods |
US11295316B2 (en) | 2016-06-10 | 2022-04-05 | OneTrust, LLC | Data processing systems for identity validation for consumer rights requests and related methods |
US11294939B2 (en) | 2016-06-10 | 2022-04-05 | OneTrust, LLC | Data processing systems and methods for automatically detecting and documenting privacy-related aspects of computer software |
US11301796B2 (en) | 2016-06-10 | 2022-04-12 | OneTrust, LLC | Data processing systems and methods for customizing privacy training |
US11301589B2 (en) | 2016-06-10 | 2022-04-12 | OneTrust, LLC | Consent receipt management systems and related methods |
US11308435B2 (en) | 2016-06-10 | 2022-04-19 | OneTrust, LLC | Data processing systems for identifying, assessing, and remediating data processing risks using data modeling techniques |
US11328092B2 (en) | 2016-06-10 | 2022-05-10 | OneTrust, LLC | Data processing systems for processing and managing data subject access in a distributed environment |
US11366786B2 (en) | 2016-06-10 | 2022-06-21 | OneTrust, LLC | Data processing systems for processing data subject access requests |
US11334682B2 (en) | 2016-06-10 | 2022-05-17 | OneTrust, LLC | Data subject access request processing systems and related methods |
US11336697B2 (en) | 2016-06-10 | 2022-05-17 | OneTrust, LLC | Data processing systems for data-transfer risk identification, cross-border visualization generation, and related methods |
US11334681B2 (en) | 2016-06-10 | 2022-05-17 | OneTrust, LLC | Application privacy scanning systems and related meihods |
US10848523B2 (en) | 2016-06-10 | 2020-11-24 | OneTrust, LLC | Data processing systems for data-transfer risk identification, cross-border visualization generation, and related methods |
US11343284B2 (en) | 2016-06-10 | 2022-05-24 | OneTrust, LLC | Data processing systems and methods for performing privacy assessments and monitoring of new versions of computer code for privacy compliance |
US11347889B2 (en) | 2016-06-10 | 2022-05-31 | OneTrust, LLC | Data processing systems for generating and populating a data inventory |
US11354435B2 (en) | 2016-06-10 | 2022-06-07 | OneTrust, LLC | Data processing systems for data testing to confirm data deletion and related methods |
US10873606B2 (en) | 2016-06-10 | 2020-12-22 | OneTrust, LLC | Data processing systems for data-transfer risk identification, cross-border visualization generation, and related methods |
US10867007B2 (en) | 2016-06-10 | 2020-12-15 | OneTrust, LLC | Data processing systems for fulfilling data subject access requests and related methods |
US11328240B2 (en) | 2016-06-10 | 2022-05-10 | OneTrust, LLC | Data processing systems for assessing readiness for responding to privacy-related incidents |
US11366909B2 (en) | 2016-06-10 | 2022-06-21 | OneTrust, LLC | Data processing and scanning systems for assessing vendor risk |
US12147578B2 (en) | 2016-06-10 | 2024-11-19 | OneTrust, LLC | Consent receipt management systems and related methods |
US11392720B2 (en) | 2016-06-10 | 2022-07-19 | OneTrust, LLC | Data processing systems for verification of consent and notice processing and related methods |
US12136055B2 (en) | 2016-06-10 | 2024-11-05 | OneTrust, LLC | Data processing systems for identifying, assessing, and remediating data processing risks using data modeling techniques |
US11403377B2 (en) | 2016-06-10 | 2022-08-02 | OneTrust, LLC | Privacy management systems and methods |
US11409908B2 (en) | 2016-06-10 | 2022-08-09 | OneTrust, LLC | Data processing systems and methods for populating and maintaining a centralized database of personal data |
US11416636B2 (en) | 2016-06-10 | 2022-08-16 | OneTrust, LLC | Data processing consent management systems and related methods |
US11418492B2 (en) | 2016-06-10 | 2022-08-16 | OneTrust, LLC | Data processing systems and methods for using a data model to select a target data asset in a data migration |
US11418516B2 (en) | 2016-06-10 | 2022-08-16 | OneTrust, LLC | Consent conversion optimization systems and related methods |
US11416798B2 (en) | 2016-06-10 | 2022-08-16 | OneTrust, LLC | Data processing systems and methods for providing training in a vendor procurement process |
US11416634B2 (en) | 2016-06-10 | 2022-08-16 | OneTrust, LLC | Consent receipt management systems and related methods |
US11416589B2 (en) | 2016-06-10 | 2022-08-16 | OneTrust, LLC | Data processing and scanning systems for assessing vendor risk |
US11416576B2 (en) | 2016-06-10 | 2022-08-16 | OneTrust, LLC | Data processing consent capture systems and related methods |
US11416590B2 (en) | 2016-06-10 | 2022-08-16 | OneTrust, LLC | Data processing and scanning systems for assessing vendor risk |
US11416109B2 (en) | 2016-06-10 | 2022-08-16 | OneTrust, LLC | Automated data processing systems and methods for automatically processing data subject access requests using a chatbot |
US11438386B2 (en) | 2016-06-10 | 2022-09-06 | OneTrust, LLC | Data processing systems for data-transfer risk identification, cross-border visualization generation, and related methods |
US12118121B2 (en) | 2016-06-10 | 2024-10-15 | OneTrust, LLC | Data subject access request processing systems and related methods |
US12086748B2 (en) | 2016-06-10 | 2024-09-10 | OneTrust, LLC | Data processing systems for assessing readiness for responding to privacy-related incidents |
US12052289B2 (en) | 2016-06-10 | 2024-07-30 | OneTrust, LLC | Data processing systems for data-transfer risk identification, cross-border visualization generation, and related methods |
US12045266B2 (en) | 2016-06-10 | 2024-07-23 | OneTrust, LLC | Data processing systems for generating and populating a data inventory |
US11449633B2 (en) | 2016-06-10 | 2022-09-20 | OneTrust, LLC | Data processing systems and methods for automatic discovery and assessment of mobile software development kits |
US11461500B2 (en) | 2016-06-10 | 2022-10-04 | OneTrust, LLC | Data processing systems for cookie compliance testing with website scanning and related methods |
US11461722B2 (en) | 2016-06-10 | 2022-10-04 | OneTrust, LLC | Questionnaire response automation for compliance management |
US11468386B2 (en) | 2016-06-10 | 2022-10-11 | OneTrust, LLC | Data processing systems and methods for bundled privacy policies |
US11468196B2 (en) | 2016-06-10 | 2022-10-11 | OneTrust, LLC | Data processing systems for validating authorization for personal data collection, storage, and processing |
US11475136B2 (en) | 2016-06-10 | 2022-10-18 | OneTrust, LLC | Data processing systems for data transfer risk identification and related methods |
US12026651B2 (en) | 2016-06-10 | 2024-07-02 | OneTrust, LLC | Data processing systems and methods for providing training in a vendor procurement process |
US11481710B2 (en) | 2016-06-10 | 2022-10-25 | OneTrust, LLC | Privacy management systems and methods |
US11488085B2 (en) | 2016-06-10 | 2022-11-01 | OneTrust, LLC | Questionnaire response automation for compliance management |
US11960564B2 (en) | 2016-06-10 | 2024-04-16 | OneTrust, LLC | Data processing systems and methods for automatically blocking the use of tracking tools |
US11520928B2 (en) | 2016-06-10 | 2022-12-06 | OneTrust, LLC | Data processing systems for generating personal data receipts and related methods |
US11921894B2 (en) | 2016-06-10 | 2024-03-05 | OneTrust, LLC | Data processing systems for generating and populating a data inventory for processing data access requests |
US11868507B2 (en) | 2016-06-10 | 2024-01-09 | OneTrust, LLC | Data processing systems for cookie compliance testing with website scanning and related methods |
US11544405B2 (en) | 2016-06-10 | 2023-01-03 | OneTrust, LLC | Data processing systems for verification of consent and notice processing and related methods |
US11544667B2 (en) | 2016-06-10 | 2023-01-03 | OneTrust, LLC | Data processing systems for generating and populating a data inventory |
US11361057B2 (en) | 2016-06-10 | 2022-06-14 | OneTrust, LLC | Consent receipt management systems and related methods |
US11727141B2 (en) | 2016-06-10 | 2023-08-15 | OneTrust, LLC | Data processing systems and methods for synching privacy-related user consent across multiple computing devices |
US11551174B2 (en) | 2016-06-10 | 2023-01-10 | OneTrust, LLC | Privacy management systems and methods |
US11550897B2 (en) | 2016-06-10 | 2023-01-10 | OneTrust, LLC | Data processing and scanning systems for assessing vendor risk |
US11558429B2 (en) | 2016-06-10 | 2023-01-17 | OneTrust, LLC | Data processing and scanning systems for generating and populating a data inventory |
US11556672B2 (en) | 2016-06-10 | 2023-01-17 | OneTrust, LLC | Data processing systems for verification of consent and notice processing and related methods |
US11562097B2 (en) | 2016-06-10 | 2023-01-24 | OneTrust, LLC | Data processing systems for central consent repository and related methods |
US11675929B2 (en) | 2016-06-10 | 2023-06-13 | OneTrust, LLC | Data processing consent sharing systems and related methods |
US11586700B2 (en) | 2016-06-10 | 2023-02-21 | OneTrust, LLC | Data processing systems and methods for automatically blocking the use of tracking tools |
US11586762B2 (en) | 2016-06-10 | 2023-02-21 | OneTrust, LLC | Data processing systems and methods for auditing data request compliance |
US11651104B2 (en) | 2016-06-10 | 2023-05-16 | OneTrust, LLC | Consent receipt management systems and related methods |
US11651106B2 (en) | 2016-06-10 | 2023-05-16 | OneTrust, LLC | Data processing systems for fulfilling data subject access requests and related methods |
US11609939B2 (en) | 2016-06-10 | 2023-03-21 | OneTrust, LLC | Data processing systems and methods for automatically detecting and documenting privacy-related aspects of computer software |
US10846261B2 (en) | 2016-06-10 | 2020-11-24 | OneTrust, LLC | Data processing systems for processing data subject access requests |
US11645353B2 (en) | 2016-06-10 | 2023-05-09 | OneTrust, LLC | Data processing consent capture systems and related methods |
US11625502B2 (en) | 2016-06-10 | 2023-04-11 | OneTrust, LLC | Data processing systems for identifying and modifying processes that are subject to data subject access requests |
US11636171B2 (en) | 2016-06-10 | 2023-04-25 | OneTrust, LLC | Data processing user interface monitoring systems and related methods |
US11645418B2 (en) | 2016-06-10 | 2023-05-09 | OneTrust, LLC | Data processing systems for data testing to confirm data deletion and related methods |
US20170364850A1 (en) * | 2016-06-17 | 2017-12-21 | Accenture Global Solutions Limited | Workforce strategy insights |
US10699227B2 (en) * | 2016-06-17 | 2020-06-30 | Accenture Global Solutions Limited | Workforce strategy insights |
US11663359B2 (en) | 2017-06-16 | 2023-05-30 | OneTrust, LLC | Data processing systems for identifying whether cookies contain personally identifying information |
US11373007B2 (en) | 2017-06-16 | 2022-06-28 | OneTrust, LLC | Data processing systems for identifying whether cookies contain personally identifying information |
US11544409B2 (en) | 2018-09-07 | 2023-01-03 | OneTrust, LLC | Data processing systems and methods for automatically protecting sensitive data within privacy management systems |
US11144675B2 (en) | 2018-09-07 | 2021-10-12 | OneTrust, LLC | Data processing systems and methods for automatically protecting sensitive data within privacy management systems |
US11947708B2 (en) | 2018-09-07 | 2024-04-02 | OneTrust, LLC | Data processing systems and methods for automatically protecting sensitive data within privacy management systems |
US11157654B2 (en) | 2018-09-07 | 2021-10-26 | OneTrust, LLC | Data processing systems for orphaned data identification and deletion and related methods |
US11593523B2 (en) | 2018-09-07 | 2023-02-28 | OneTrust, LLC | Data processing systems for orphaned data identification and deletion and related methods |
US10963591B2 (en) | 2018-09-07 | 2021-03-30 | OneTrust, LLC | Data processing systems for orphaned data identification and deletion and related methods |
CN110335004A (en) * | 2019-05-08 | 2019-10-15 | 重庆天蓬网络有限公司 | A kind of product and engineering relationships solution based on responsibility system |
IT202000013060A1 (en) | 2020-06-03 | 2021-12-03 | Stefano Pepice | CAUSATION MANAGEMENT PROCEDURE AND REAL-TIME MANAGEMENT MODEL OF INDUSTRIAL PRODUCTION |
US11797528B2 (en) | 2020-07-08 | 2023-10-24 | OneTrust, LLC | Systems and methods for targeted data discovery |
US11968229B2 (en) | 2020-07-28 | 2024-04-23 | OneTrust, LLC | Systems and methods for automatically blocking the use of tracking tools |
US11444976B2 (en) | 2020-07-28 | 2022-09-13 | OneTrust, LLC | Systems and methods for automatically blocking the use of tracking tools |
US11475165B2 (en) | 2020-08-06 | 2022-10-18 | OneTrust, LLC | Data processing systems and methods for automatically redacting unstructured data from a data subject access request |
US11436373B2 (en) | 2020-09-15 | 2022-09-06 | OneTrust, LLC | Data processing systems and methods for detecting tools for the automatic blocking of consent requests |
US11704440B2 (en) | 2020-09-15 | 2023-07-18 | OneTrust, LLC | Data processing systems and methods for preventing execution of an action documenting a consent rejection |
US11526624B2 (en) | 2020-09-21 | 2022-12-13 | OneTrust, LLC | Data processing systems and methods for automatically detecting target data transfers and target data processing |
US12265896B2 (en) | 2020-10-05 | 2025-04-01 | OneTrust, LLC | Systems and methods for detecting prejudice bias in machine-learning models |
US11397819B2 (en) | 2020-11-06 | 2022-07-26 | OneTrust, LLC | Systems and methods for identifying data processing activities based on data discovery results |
US12277232B2 (en) | 2020-11-06 | 2025-04-15 | OneTrust, LLC | Systems and methods for identifying data processing activities based on data discovery results |
US11615192B2 (en) | 2020-11-06 | 2023-03-28 | OneTrust, LLC | Systems and methods for identifying data processing activities based on data discovery results |
US12259882B2 (en) | 2021-01-25 | 2025-03-25 | OneTrust, LLC | Systems and methods for discovery, classification, and indexing of data in a native computing system |
US11687528B2 (en) | 2021-01-25 | 2023-06-27 | OneTrust, LLC | Systems and methods for discovery, classification, and indexing of data in a native computing system |
US11442906B2 (en) | 2021-02-04 | 2022-09-13 | OneTrust, LLC | Managing custom attributes for domain objects defined within microservices |
US11494515B2 (en) | 2021-02-08 | 2022-11-08 | OneTrust, LLC | Data processing systems and methods for anonymizing data samples in classification analysis |
US11601464B2 (en) | 2021-02-10 | 2023-03-07 | OneTrust, LLC | Systems and methods for mitigating risks of third-party computing system functionality integration into a first-party computing system |
US11775348B2 (en) | 2021-02-17 | 2023-10-03 | OneTrust, LLC | Managing custom workflows for domain objects defined within microservices |
US11546661B2 (en) | 2021-02-18 | 2023-01-03 | OneTrust, LLC | Selective redaction of media content |
US11533315B2 (en) | 2021-03-08 | 2022-12-20 | OneTrust, LLC | Data transfer discovery and analysis systems and related methods |
US11816224B2 (en) | 2021-04-16 | 2023-11-14 | OneTrust, LLC | Assessing and managing computational risk involved with integrating third party computing functionality within a computing system |
US11562078B2 (en) | 2021-04-16 | 2023-01-24 | OneTrust, LLC | Assessing and managing computational risk involved with integrating third party computing functionality within a computing system |
US12153704B2 (en) | 2021-08-05 | 2024-11-26 | OneTrust, LLC | Computing platform for facilitating data exchange among computing environments |
US11620142B1 (en) | 2022-06-03 | 2023-04-04 | OneTrust, LLC | Generating and customizing user interfaces for demonstrating functions of interactive user environments |
CN115062081A (en) * | 2022-06-29 | 2022-09-16 | 中国平安财产保险股份有限公司 | Artificial intelligence-based data management method, device, electronic device and medium |
CN116109116A (en) * | 2023-04-13 | 2023-05-12 | 中建安装集团有限公司 | Cloud computing-based comprehensive application program supervision control system and method |
CN117575335A (en) * | 2024-01-17 | 2024-02-20 | 成都赛力斯科技有限公司 | Vehicle development project risk monitoring method, device, system, equipment and medium |
CN118863836A (en) * | 2024-08-02 | 2024-10-29 | 想买科技(深圳)有限公司 | Human resource management system and method based on cloud computing |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20160292621A1 (en) | Automatically identifying a project's staffing-availability risk | |
US10999140B2 (en) | Mitigation of likelihood and impact of a server-reconfiguration failure | |
US11138006B2 (en) | Hybrid development systems and methods | |
US11671505B2 (en) | Enterprise health score and data migration | |
US10726366B2 (en) | Scheduling and simulation system | |
US11307770B2 (en) | Capacity forecasting based on capacity policies and transactions | |
US8306841B2 (en) | Enterprise project management system and method therefor | |
US20200074369A1 (en) | Systems and methods for optimizing automated modelling of resource allocation | |
US20150286982A1 (en) | Dynamically modeling workloads, staffing requirements, and resource requirements of a security operations center | |
US20160132828A1 (en) | Real-time continuous realignment of a large-scale distributed project | |
US11017339B2 (en) | Cognitive labor forecasting | |
US20160267415A1 (en) | Compensating for reduced availability of a disrupted project resource | |
US20190213551A1 (en) | System and method of collecting project metrics to optimize distributed development efforts | |
EP2375367A1 (en) | Project management system | |
US10504045B2 (en) | Audit schedule determination | |
US9256850B2 (en) | Orphan token management during in-flight process system migration | |
CN117875889B (en) | Digital management method and system for field operation | |
US20200348926A1 (en) | System and method for automating environment management of one or more software applications | |
US20190107815A1 (en) | Data architecture and improved model object interfaces for supporting integration of multiple disparate databases useable to model availability of a fleet of vehicles | |
US11601347B2 (en) | Identification of incident required resolution time | |
US11856053B2 (en) | Systems and methods for hybrid burst optimized regulated workload orchestration for infrastructure as a service | |
JP2023514703A (en) | Method and apparatus for asset management | |
US20170270611A1 (en) | Processing system to automatically assign electronic records to verification process subset levels | |
US20210334718A1 (en) | System for managing enterprise dataflows | |
US11157857B2 (en) | Quality-based automated application-portfolio rationalization |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: INTERNATIONAL BUSINESS MACHINES CORPORATION, NEW Y Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:CICCONE, LISA;CONNORS, DANIEL P.;FIOTO, GEORGE A., JR.;AND OTHERS;SIGNING DATES FROM 20150319 TO 20150325;REEL/FRAME:035283/0918 |
|
STPP | Information on status: patent application and granting procedure in general |
Free format text: NON FINAL ACTION MAILED |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |